Multi-level fuzzy synthesis evaluation on construction supply chain risk

Author(s):  
Wenzhen Xiao ◽  
Zhenyuan Liu ◽  
Weihua Zhong
Author(s):  
Cao Liang ◽  
Feng Jingchun ◽  
Ren Yuan

With the development of China's economy, large-scale engineering and complex engineering are emerging. The Engineering Procurement Construction (EPC) project general contracting model is widely used in civil engineering, water conservancy, railway, water treatment, waste incineration plants and other large engineering area. The increasing complexity of construction technology and the risks are facing overwhelming and fragile supply chain. Based on the deep analysis of supply chain operation reference (SCOR) model, which is widely used in various fields of industry, this article puts forward the preliminary index system of supply chain risk of EPC project by analytic hierarchy process (AHP). The risk index system of waste incineration project including 5 first-level risk indicators and 27 second-level risk indicators has been established and determined. The multi-level grey model is used to evaluate the risk index, calculate the grey evaluation coefficient and the grey evaluation weight vector as well as the weight matrix, draw the specific risk evaluation value of the project, and sort the first level index. Finally, an EPC example of a waste incineration in Hubei Province is used to verify the feasibility and reliability of the method.


Author(s):  
Leyan Wang

Potential supply chain risks are one of the hidden dangers that may undermine the reliable and stable operation of enterprises. Due to the practicality and complexity of supply chain risk management, the field has attracted wide attention from researchers. The urgent problems of supply chain management at present include how to help enterprises analyze and identify supply chain risk factors, predict and control the potential risks, and provide the corresponding preventive measures for various risks. There are many assessment methods in the research process of supply chain risks. In this paper, a multi-level fuzzy comprehensive assessment method is adopted. Based on the current risk status of the traffic enterprises in our country, an attempt is made to apply the multi-level fuzzy comprehensive assessment method to risk assessment. The main risk factors faced by traffic enterprises in the supply chain are analyzed to obtain the assessment results, which can provide ideas for further research in the future.


2012 ◽  
Vol 6-7 ◽  
pp. 773-777 ◽  
Author(s):  
Yan Ling Wang

The intense competition of global markets and consumers' high expectations forced enterprises to invest and concentrate on the relationship with their customers and suppliers. The growing interest in supply chain management, both in developed and developing countries in the fisheries. With the catastrophic events in the fisheries supply chain, the diversity of the fisheries risk and insurance issues become increasingly important. However, participants in the supply chain is a separate and independent economic entities, and only consider their own interests. In this article, the fisheries supply chain insurance contract on the basis of the model and the diversity of the fisheries risk and insurance policy issues, the behavior of each participant. In this article, the diversity of the fisheries supply chain risk and insurance process, the lack of sufficient knowledge of the fisheries supply chain contract signing or the exact probability of the insured event, the fisheries supply chain risk insurance companies use the information provided by the fisheries supply chain contract signature the signing of the contract or the behavior of the fisheries supply chain insurers of people insured or fisheries supply chain and fisheries supply chain in order to establish the parameters of the insurance contract of the fisheries supply chain.


Sign in / Sign up

Export Citation Format

Share Document