Hybrid state estimation of power system using conventional and phasor measurements

Author(s):  
Papu Rabha ◽  
Chaw Chuaong Shyam ◽  
Ashoke Kumar Sinha
2014 ◽  
Vol 63 (2) ◽  
pp. 352-363 ◽  
Author(s):  
Farrokh Aminifar ◽  
Mohammad Shahidehpour ◽  
Mahmud Fotuhi-Firuzabad ◽  
Saeed Kamalinia

2019 ◽  
Vol 139 ◽  
pp. 01025
Author(s):  
Irina Kolosok ◽  
Elena Korkina ◽  
Aleksandr Tikhonov

As the Smart Grid is being developed in the Russian Federation, a need in FACTS arises at resolving the issues of increasing the transmission capacity of electric power lines, voltage control, etc. The paper considers the issues of installing phasor measurement units (PMU) at the FACTS for the electric power system state estimation of (EPS SE). The relevance of the paper is explained by the mandatory introduction of PMUs at newly commissioned power engineering facilities (PEF) scheduled for 2020 and farther. PMUs registering voltage and current phasors at FACTS allow increasing the precision of results of the EPS SE problem and improving the electric modes at the considered PEF.


Energies ◽  
2019 ◽  
Vol 12 (14) ◽  
pp. 2688
Author(s):  
Matsukawa ◽  
Watanabe ◽  
Wahab ◽  
Othman

Operation of a power system close to the voltage stability limit due to increasing of load demand and limited power sources may result in disastrous economic loss with voltage collapse of the entire power system. A system operator has to understand how far the system is from the critical boundary of the voltage collapse. This paper investigated the influence of State Estimation (SE) in the calculation of the Critical Boundary Index (CBI) as a voltage stability index. For SE, Hybrid State Estimation (HSE), including the measurement set of both Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) and Phasor Measurement Unit (PMU), is employed. Concurrently, the CBI is estimated using voltage phasor estimated by HSE based on optimal PMU location, which is selected from a Pareto optimal front obtained by the Non-dominated Sorting Genetic Algorithm II (NSGA-II). As a result of CBI estimation, HSE using PMU is relatively accurate in voltage stability index estimation compared to SCADA SE, which uses the RTU alone. However, when a mixed measurement condition in some lines affects the CBI estimation, it is suggested that it may be necessary to discard PMU measurements in some cases.


Sign in / Sign up

Export Citation Format

Share Document