Study on the Integrated Optimization of Heating Furnace Production Process

Author(s):  
Tianyi Lu ◽  
Qiong Xia ◽  
Liangliang Sun ◽  
Yupeng Li ◽  
Wanying Zhu ◽  
...  
Synthesiology ◽  
2012 ◽  
Vol 5 (2) ◽  
pp. 98-112 ◽  
Author(s):  
Kiyoshi NISHIOKA ◽  
Yasushi MIZUTANI ◽  
Hironori UENO ◽  
Hirofumi KAWASAKI ◽  
Yasunori BABA

2014 ◽  
Vol 894 ◽  
pp. 284-287
Author(s):  
Li Qiang Zhu ◽  
Qin Li Xue ◽  
Shi Hong Zhang

In the paper, based on the results of lean gas furnace temperature field, the study was carried out on heating earthenware. Compared with earthenware which heated with electric furnace, earthenware heated with Low-carbon Catalytic Combustion Furnace was having apparent advantages. The content of the pollutants in exhaust gas was detected during heating in the same time. It would be the conclusion that a trace of pollutants was produced in the highly clean combustion furnace production process, from analyzing and comparing the data under the condition of heating with earthenware and heating without earthenware in the catalytic combustion furnace.


2012 ◽  
Vol 229-231 ◽  
pp. 995-998 ◽  
Author(s):  
Yu Mei Sun ◽  
Ran Ding ◽  
Qi Qiang Li

Steam power system and production process are the important parts of the process industry. Steam power system provides the production process steam, electricity and other energy it needs, and the relationship between them is very close. In order to obtain the maximum benefit of the total plant, the integrated optimization of the production process and steam power system is very important. In this paper, the framework of the integrated optimization model is established. An iterative optimization method based on genetic algorithm is proposed to solve the integrated model. Simulation example shows the effectiveness of the proposed method.


2012 ◽  
Vol 5 (2) ◽  
pp. 96-113
Author(s):  
Kiyoshi NISHIOKA ◽  
Yasushi MIZUTANI ◽  
Hironori UENO ◽  
Hirofumi KAWASAKI ◽  
Yasunori BABA

2019 ◽  
Vol 28 (9) ◽  
pp. 50-53
Author(s):  
N.N. Martynov ◽  
◽  
G.A. Sidorenko ◽  
G.B. Zinyukhin ◽  
E.Sh. Maneeva ◽  
...  
Keyword(s):  

2018 ◽  
Vol 4 (2) ◽  
pp. 43-55
Author(s):  
Ika Yulianti ◽  
Endah Masrunik ◽  
Anam Miftakhul Huda ◽  
Diana Elvianita

This study aims to find a comparison of the calculation of the cost of goods manufactured in the CV. Mitra Setia Blitar uses the company's method and uses the Job Order Costing (JOC) method. The method used in this study is quantitative. The types of data used are quantitative and qualitative. Quantitative data is in the form of map production cost data while qualitative data is in the form of information about map production process. The result of calculating the cost of production of the map between the two methods results in a difference of Rp. 306. Calculation using the company method is more expensive than using the Job Order Costing method. Calculation of cost of goods manufactured using the company method is Rp. 2,205,000, - or Rp. 2,205, - each unit. While using the Job Order Costing (JOC) method is Rp. 1,899,000, - or Rp 1,899, - each unit. So that the right method used in calculating the cost of production is the Job Order Costing (JOC) method


Sign in / Sign up

Export Citation Format

Share Document