Optimal Project Completion Time, a Multi-Objective Model and Monte Carlo Simulation-Optimization Solution

Author(s):  
Mohammad M. AlDurgam
2012 ◽  
Vol 452-453 ◽  
pp. 548-552 ◽  
Author(s):  
Hui Jie Li ◽  
Ling Yu Yang ◽  
Gong Zhang Shen

The CAT III longitudinal automatic landing control laws based on multi-objective optimization is discussed. Firstly summarized the CAT III airworthiness criteria and transformed into the specifications of control system. The configuration of the longitudinal automatic landing controllers is proposed secondly and multi-objective optimization is used to tradeoff free parameters of the controllers. The Monte Carlo simulation results show the designed control laws fulfill the CAT III requirements, when there are uncertainties of structure, measurement error and disturbances.


2020 ◽  
Vol 27 (10) ◽  
pp. 3095-3113
Author(s):  
Lihui Zhang ◽  
Guyu Dai ◽  
Xin Zou ◽  
Jianxun Qi

PurposeInterrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to mitigate the negative impact caused by work continuity uncertainty based on the notion of robustness.Design/methodology/approachThis paper develops a float-based robustness measurement method for the work continuity uncertainty in repetitive projects. A multi-objective optimization model is formulated to generate a schedule that achieves a balance between crew numbers and robustness. This model is solved using two modules: optimization module and decision-making module. The Monte Carlo simulation is designed to validate the effectiveness of the generated schedule.FindingsThe results confirmed that it is necessary to consider the robustness as an essential factor when scheduling a repetitive project with uncertainty. Project managers may develop a schedule that is subject to delays if they only make decisions according to the results of the deadline satisfaction problem. The Monte Carlo simulation validated that an appropriate way to measure robustness is conducive to generating a schedule that can avoid unnecessary delay, compared to the schedule generated by the traditional model.Originality/valueAvailable studies assume that the work continuity is constant, but it cannot always be maintained when affected by uncertainty. This paper regards the work continuity as a new type of uncertainty factor and investigates how to mitigate its negative effects. The proposed float-based robustness measurement can measure the ability of a schedule to absorb unpredictable and harmful interruptions, and the proposed multi-objective scheduling model provides a way to incorporate the uncertainty into a schedule.


Sign in / Sign up

Export Citation Format

Share Document