Comparison of iterative and recursive algorithms for identifying a solar power plant system

Author(s):  
Kiavash Hossein Sadeghi ◽  
Abolhassan Razminia ◽  
Emad Roshandel
2019 ◽  
Vol 125 ◽  
pp. 10003 ◽  
Author(s):  
Jaka Windarta ◽  
Ardhito Pratama ◽  
Denis ◽  
Agung Nugroho

Indonesia is a country that is geographically located right in the equator and variously advantage and the wide for the use of solar energy. Indonesia has a relatively high radiation level, which is 4.80 kWh / m2 / day. Cemara Island is a tourist place but does not have electricity from PLN because access to its location is still difficult to reach. So from that chosen the planning system for the use of electrical energy using solar energy. However, economic analysis is needed so that the estimated weaknesses of the off-grid solar system can be estimated so as to reduce the risk of losses. The testing of each component in the Solar Power Plant system also needs to be done to determine the condition and quality of the components to be used. The economic analysis of the Cemara Island Solar Power Plant System with an initial investment of Rp 52,553,000, in scenario 1 uses interest at 6%, then in scenario 2 without using interest. Through calculations by looking for the value of COE (Energy Cost), NPC (Net Present Cost) and BEP (Break-Even Point), so that costs can be calculated by the manager with the number of 11 managers per month.


2021 ◽  
Vol 2111 (1) ◽  
pp. 012009
Author(s):  
Nurhening Yuniarti ◽  
Alex Sandria Jaya Wardhana ◽  
Bagas Woro Saputra

Abstract This research aimed to make, test, and analyse the performance of 600 W on-grid solar power plant system based on maximum power point tracking (MPPT). This research used a developmental research method with the ADDIE model that was developed by Robert Maribe Branch. The results obtained data that the average power that was produced and distributed to the PLN grid reached 22.5 W with 95.67% efficiency from the grid-tie inverter usage.


2021 ◽  
Vol 16 (3) ◽  
pp. 53-60
Author(s):  
Evgeniy A. Godovnikov ◽  
Mikhail G. Korotkov ◽  
Vitaliy M. Tatyankin

This article discusses the development of software for the diesel generator limitation controller as part of a hybrid solar power plant system. контроллера ограничения работы дизель-генератора In the course of the work, a block diagram of the system was proposed, and the controller software was described in detail. The aim of this work is to reduce the operating time of a fuel generator by limiting its operating time depending on the battery charge level and time of day.


2018 ◽  
Author(s):  
P. K. Verma ◽  
A. K. Vishnoi ◽  
Naveen Kumar ◽  
Arun K. Nayak ◽  
G. J. Gorade ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document