Nonlinear dynamics analysis of planetary gear systemin large-scale wind power generation equipment

Author(s):  
Peng Yumin ◽  
Luan Zhongquan ◽  
Ma Chao ◽  
Wang Shaohong
2021 ◽  
Author(s):  
Reza Ghaffari

Wind power generation is uncertain and intermittent accentuating variability. Currently in many power systems worldwide, the total generation-load unbalance caused by mismatch between forecast and actual wind power output is handled by automatic governor control and real-time 5-minute balancing markets, which are operated by the independent system operators for maintaining reliable operation of power systems. Mechanisms such as automatic governor control and real-time 5-minute balancing markets are in place to correct the mismatch between the load forecast and the actual load. They are not designed to address increased uncertainty and variability introduced by large-scale wind power or solar power generation expected in the future. Thus, large-scale wind power generation with increased uncertainty and intermittency causing variability poses a techno-economic challenge of sourcing least cost load balancing services (reserve).


Energies ◽  
2020 ◽  
Vol 13 (24) ◽  
pp. 6532
Author(s):  
Vahab Rostampour ◽  
Thom S. Badings ◽  
Jacquelien M. A. Scherpen

We present a Buildings-to-Grid (BtG) integration framework with intermittent wind-power generation and demand flexibility management provided by buildings. First, we extend the existing BtG models by introducing uncertain wind-power generation and reformulating the interactions between the Transmission System Operator (TSO), Distribution System Operators (DSO), and buildings. We then develop a unified BtG control framework to deal with forecast errors in the wind power, by considering ancillary services from both reserves and demand-side flexibility. The resulting framework is formulated as a finite-horizon stochastic model predictive control (MPC) problem, which is generally hard to solve due to the unknown distribution of the wind-power generation. To overcome this limitation, we present a tractable robust reformulation, together with probabilistic feasibility guarantees. We demonstrate that the proposed demand flexibility management can substitute the traditional reserve scheduling services in power systems with high levels of uncertain generation. Moreover, we show that this change does not jeopardize the stability of the grid or violate thermal comfort constraints of buildings. We finally provide a large-scale Monte Carlo simulation study to confirm the impact of achievements.


2014 ◽  
Vol 644-650 ◽  
pp. 3890-3893
Author(s):  
Ze Zhou ◽  
Xu Zhang ◽  
Tian Long Shao

The Distributed Generation can enhance the system power supply reliability and alleviate the pitch peak and restricted transmission capacity caused by large-scale wind power grid connection and other problems. In Fuxin, the system power supply is inadequate; the wind power integration is restricted and there are rich wind power reserves. Based on the current situation, this paper analyzes the necessity and feasibility of developing the distributed wind power in Fuxin and provides advisory opinions on the development sites and mode of wind power generation.


Sign in / Sign up

Export Citation Format

Share Document