Cost Estimation of Software Project Development by Using Case-Based Reasoning Technology with Clustering Index Mechanism

Author(s):  
Zheng-Wei Huang
2014 ◽  
Vol 43 ◽  
pp. 195-203 ◽  
Author(s):  
Joseph Ahn ◽  
Sae-Hyun Ji ◽  
Moonseo Park ◽  
Hyun-Soo Lee ◽  
Sooyoung Kim ◽  
...  

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Fentahun Moges Kasie ◽  
Glen Bright

Purpose This paper aims to propose an intelligent system that serves as a cost estimator when new part orders are received from customers. Design/methodology/approach The methodologies applied in this study were case-based reasoning (CBR), analytic hierarchy process, rule-based reasoning and fuzzy set theory for case retrieval. The retrieved cases were revised using parametric and feature-based cost estimation techniques. Cases were represented using an object-oriented (OO) approach to characterize them in n-dimensional Euclidean vector space. Findings The proposed cost estimator retrieves historical cases that have the most similar cost estimates to the current new orders. Further, it revises the retrieved cost estimates based on attribute differences between new and retrieved cases using parametric and feature-based cost estimation techniques. Research limitations/implications The proposed system was illustrated using a numerical example by considering different lathe machine operations in a computer-based laboratory environment; however, its applicability was not validated in industrial situations. Originality/value Different intelligent methods were proposed in the past; however, the combination of fuzzy CBR, parametric and feature-oriented methods was not addressed in product cost estimation problems.


2013 ◽  
Vol 19 (1) ◽  
pp. 86-96 ◽  
Author(s):  
Sangyong Kim

Cost estimating of highway projects with high accuracy at the early stage of project development is crucial for planning and feasibility studies. Various research have been attempted to develop cost prediction models in the early stage of a construction life cycle. This study uses the hybrid estimating tool to provide an effective cost data management for highway projects and accordingly develops a realistic cost estimating system. This study focused on the development of a more accurate estimate technique for highway projects in South Korea at the early stage using hybrid analytic hierarchy process (AHP) and case-based reasoning (CBR). Real case studies are used to demonstrate and validate the benefits of the proposed approach. It is expected that the developed CBR system is to provide decision-makers with accurate cost information to asses and compare multiple alternatives for obtaining the optimal solution and controlling cost.


Author(s):  
Krzysztof Zima ◽  
Agnieszka Leśniak

Information regarding the cost of a construction project is available to the investor and project participants in order to determine the subsequent success of a project, given that the information they collect has an impact on the decisions they make. Cost calculations, especially in the initial phase of a project, often generate large errors. This paper presents the new approach based on a combination of the Case Based Reasoning method (CBR) with the originally selected criteria for the description of a construction project (as a result of Pearson correlation coefficient and Spearman's rank correlation coefficient) and Building Information Modeling (BIM) technology. The CBR method fulfils expectations for a simple and fast system supporting the cost estimation process. It does not require any specialist knowledge, so it will be comprehensible to cost estimation practitioners. The BIM-based model gives the opportunity for the calculation of quantity take-offs and enables the use of the information contained in the BIM model in the cost estimation process. In order to prepare the model an appropriate relational database had to be developed. With extensive research, a database of 173 construction projects, including the construction of a sports field, was obtained. There were 14 variables defined originally by authors; however, only 10 (as a result of the correlation analysis) were used for the calculation. Data related to the project were collected in the BIM model. Results estimating the project’s unit price, using the CBR method, were presented and discussed. The Mean Absolute Estimate Error was used to evaluate the model.


Sign in / Sign up

Export Citation Format

Share Document