Abstract: In every construction project, the time and cost are the two most important objectives/factors to be considered. Clients and contractors should strive to optimize the project time and cost to maximize the return. Resources are also one of the major constraints of the construction projects. In recent years, several studies have been conducted to optimize the time and cost of project under constraint conditions of resources. Since most studies assume the time and cost as deterministic parameters, uncertainties should be considered in estimating the time and cost of the project's activities when minimizing the duration and cost of the project. For this purpose, this paper embeds the fuzzy logic to handle the uncertainties in estimating the time and cost. Besides, the multi-objective genetic algorithm (MOGA) is used to develop the resourceconstrained time-cost trade-off model. Alpha-cut approach is utilized to define the accepted risk level of decision maker. The efficiency of the proposed model is demonstrated through solvinga case study project of highway construction. The results of case study project provide a set of Pareto-optimal solutions. The developed model encourage the decision making process by choosing specified risk levels and utilizing the related Pareto-front. Keywords: Construction projects, time-cost trade-off, uncertainties, fuzzy logic, MOGA,Pareto-optimal solution.


2017 ◽  
Vol 11 (3/4) ◽  
pp. 200
Author(s):  
Kiran Kumar Bathula ◽  
Palaniappan Ramu ◽  
Prashanth Neelakantan ◽  
G. Saravana Kumar

2012 ◽  
Vol 1 (3) ◽  
pp. 238
Author(s):  
Nasser Shahsavari Pour ◽  
Arman Ghamginzadeh ◽  
Mansoor Pour Kheradmand

Time and cost are two important and controllable objectives in project structures which are considerably dependent on each other. Recently, beneficiaries demands for cost and time reduction in completing a project have been increased. This study proposes a new method for time-cost trade off problem (TCTP) in uncertainty condition. To solve the model a multi objective genetic algorithm has been integrated with fuzzy theory. Efficiency of this algorithm is demonstrated through an existing case example from the literature. Finally to make the algorithm more efficient the existing parameters in the model have been set through Taguchi method.


2017 ◽  
Vol 11 (3/4) ◽  
pp. 200
Author(s):  
Palaniappan Ramu ◽  
G. Saravana Kumar ◽  
Prashanth Neelakantan ◽  
Kiran Kumar Bathula

Sign in / Sign up

Export Citation Format

Share Document