Intelligent processing system for equipment monitoring data of urban rail transit based on IOT perception

2021 ◽  
Author(s):  
Ming Zhang ◽  
Shisheng Wang ◽  
Yu jing Cai ◽  
Xiubin Xuan
2014 ◽  
Vol 580-583 ◽  
pp. 1076-1080
Author(s):  
Peng Lu Gan ◽  
Xiao Wu Tang ◽  
Wen Ming Shen ◽  
Heng Yu Wang

A position conflict exists between Harbin Urban Rail Transit Line No.1 and the branch tunnel of "7381" civil air defense tunnel. Intense tunnel interaction occurs when Line No.1 is perpendicularly tunneled across the branch tunnel. The investigation of the interaction is necessary. A 3D numerical simulation is established using FLAC3D and the vault deformation around the tunnel intersection is analyzed. The vault settlement of Line No.1 increases by 1.4 times during crosswise tunneling, while the vault settlement of branch tunnel increases 21.0mm in addition. The affected region of the tunnel intersection is further revealed. The affected length of the vault of Line No.1 and branch tunnel is 7.5 times the diameter and 6 times the width respectively. In combination with monitoring data, the reinforcement effect is studied at last. Both the vault settlement and surface settlement are well controlled in the tunnel intersection.


2021 ◽  
Vol 22 (2) ◽  
Author(s):  
Yan Liu ◽  
Mohd Asif Shah ◽  
Anton Pljonkin ◽  
Mohammad Asif Ikbal ◽  
Mohammad Shabaz

Building Information Modeling (BIM) technology has been widely used in the construction industry, especially in the field of civil construction. BIM standards, basic software and management platforms are relatively mature. The urban rail transit projects are linear projects, they not only span long lines, multiple regions, involve multiple disciplines, and are difficult to coordinate, but also have complex surrounding environments and high safety requirements. Therefore, their needs for integrated construction and operation applications are more concentrated. In order to solve the problems of data isolation, single display form, abnormal situation notification and delayed processing in urban rail transit construction monitoring, combined with GIS+BIM technology, a complete set of construction monitoring information management process and data organization plan is proposed, and the development is oriented. The construction monitoring system of project construction management focuses on solving the problems of the integration, display, early warning and secondary early warning of construction monitoring data. The system realizes the functions of input, storage, processing, three-dimensional display and early warning of measuring point information and daily measurement information. It is integrated with the GIS+BIM management and control platform, and the project is carried out in the construction project of Qingdao Rail Transit Line 8. Application, interact with functions such as model browsing, schedule control, engineering quantity management, video monitoring, etc., to improve the management efficiency and safety quality level of on-site construction.The mainstream GIS and BIM data based research on construction monitoring data standards promote the in-depth integration of construction monitoring data and improve the data entry and association efficiency.


CICTP 2020 ◽  
2020 ◽  
Author(s):  
Zhao Gao ◽  
Min Yang ◽  
Guoqiang Li ◽  
Jinghua Tai

CICTP 2020 ◽  
2020 ◽  
Author(s):  
Yucheng Wang ◽  
Mo Chen ◽  
Zhi Dong ◽  
Liang Tian ◽  
Kuo Guan ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document