Multi-Lag Benders Decomposition for Power Generation Planning with Nonanticipativity Constraints on the Dispatch of LNG Thermal Plants
2012 ◽
pp. 443-464
2018 ◽
Vol 168
◽
pp. 012022
Keyword(s):
Keyword(s):
2013 ◽
pp. 43-53
1996 ◽
Vol 3
(3-4)
◽
pp. 305-317
◽