scholarly journals Solving Multi-Mode Time-Cost-Quality Trade-off Problem in Uncertainty Condition Using a Novel Genetic Algorithm

Author(s):  
Hasan Hosseini-Nasab
2012 ◽  
Vol 1 (3) ◽  
pp. 238
Author(s):  
Nasser Shahsavari Pour ◽  
Arman Ghamginzadeh ◽  
Mansoor Pour Kheradmand

Time and cost are two important and controllable objectives in project structures which are considerably dependent on each other. Recently, beneficiaries demands for cost and time reduction in completing a project have been increased. This study proposes a new method for time-cost trade off problem (TCTP) in uncertainty condition. To solve the model a multi objective genetic algorithm has been integrated with fuzzy theory. Efficiency of this algorithm is demonstrated through an existing case example from the literature. Finally to make the algorithm more efficient the existing parameters in the model have been set through Taguchi method.


1997 ◽  
Vol 14 (4) ◽  
pp. 291-311 ◽  
Author(s):  
D. K. H. CHUA ◽  
W. T. CHAN ◽  
K. GOVINDAN

2011 ◽  
Vol 38 (2) ◽  
pp. 166-174 ◽  
Author(s):  
Hongxian Li ◽  
Mohamed Al-Hussein ◽  
Zhen Lei

The build–operate–transfer (BOT) scheme is widely applied to finance new infrastructure projects with private sector (concessionaire) participation. For a predetermined concession period (CP), assuming that CP consists of the construction duration (CD) and the concession operation period (OP), different construction durations result in different profits for the concessionaire. Meanwhile, according to the time–cost trade-off (TCT) principle, shortening the CD increases the construction cost; shortening the CD also prolongs the OP, which could increase the total benefit of BOT projects. Hence, how to arrange construction reasonably to maximize the whole profit is a key issue for a concessionary. This paper proposes a methodological framework including optimization, sensitivity analysis, and improved (incentive) genetic algorithms (GA) for BOT projects. Through the proposed methodological framework, the reasonable construction duration of a BOT project can be obtained. A numerical example is used to verify the proposed methodology.


Author(s):  
A. Azaron ◽  
C. Perkgoz ◽  
K. Kato ◽  
H. Katagiri ◽  
M. Sakawa

Sign in / Sign up

Export Citation Format

Share Document