Findings From an Operator-In-The-Loop Study on System Overview Displays in a Modernized Nuclear Power Plant

Author(s):  
Ronald L. Boring ◽  
Thomas A. Ulrich ◽  
Roger Lew

The second Operator Study of System Overviews (OSSO-2) was conducted with a three-person reactor operator crew in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) in August, 2017. The study supported control room modernization at a nuclear power plant and featured a benchmark comparison of three variants of a turbine control system (TCS): the existing analog TCS, a proposed standalone digital TCS with two displays, and the digital TCS with the addition of a third display depicting a system overview screen. TCS prototypes were developed at INL to allow evaluation of operator performance and preferences during realistic turbine scenarios in the full-scope simulator. The study revealed that completion of turbine startup was several minutes faster with the digital TCS variants than with the conventional analog TCS. Eye tracking revealed visual fixations were more widely distributed in the overview vs. standalone TCS condition, suggesting the overview screen may have cued reactor operators to verify values across the boards. Reviewing key plant parameters showed smoother transitions during load following for the digital vs. analog TCS. The study provides evidence that the new digital TCS could be used successfully by operators without extensive training or rewriting of the operating procedures, suggesting high usability for the digital TCS design. Further advantages were realized through the addition of the system overview screen to provide crews with at-a-glance indicators of key turbine parameters.

Author(s):  
Jia Qianqian ◽  
Guo Chao ◽  
Li Jianghai ◽  
Qu Ronghong

The nuclear power plant with two modular high-temperature gas-cooled reactors (HTR-PM) is under construction now. The control room of HTR-PM is designed. This paper introduces the alarm displays in the control room, and describes some verification and validation (V&V) activities of the alarm system, especially verification for some new human factor issues of the alarm system in the two modular design. In HTR-PM, besides the regular V&V similar to other NPPs, the interference effect of the alarm rings of the two reactor modules at the same time, and the potential discomfort of the two reactor operators after shift between them are focused. Verifications at early stage of the two issues are carried on the verification platform of the control room before the integrated system validation (ISV), and all the human machine interfaces (HMIs) in the control room, including the alarm system are validated in ISV. The test results on the verification platform show that the alarm displays and rings can support the operators understand the alarm information without confusion of the two reactors, and the shift between the two reactor operators have no adverse impact on operation. The results in ISV also show that the alarm system can support the operators well.


2008 ◽  
Vol 238 (12) ◽  
pp. 3522-3527 ◽  
Author(s):  
Sheue-Ling Hwang ◽  
Jhih-Tsong Lin ◽  
Guo-Feng Liang ◽  
Yi-Jan Yau ◽  
Tzu-Chung Yenn ◽  
...  

2016 ◽  
Author(s):  
Katya Lee Le Blanc ◽  
Gordon Ross Bower ◽  
Rachael Ann Hill ◽  
Zachary Alexander Spielman ◽  
Brandon Charles Rice