Some experiences on track-bridge interaction in Japan

Author(s):  
N Matsumoto ◽  
K Asanuma
Keyword(s):  
2021 ◽  
Vol 283 ◽  
pp. 122794
Author(s):  
Ling-Yu Zhou ◽  
Lei Zhao ◽  
Akim D. Mahunon ◽  
Ying-Ying Zhang ◽  
Hua-Yong Li ◽  
...  

Mathematics ◽  
2021 ◽  
Vol 9 (4) ◽  
pp. 431
Author(s):  
Junjie Ye ◽  
Hao Sun

In order to study the influence of an integration time step on dynamic calculation of a vehicle-track-bridge under high-speed railway, a vehicle-track-bridge (VTB) coupled model is established. The influence of the integration time step on calculation accuracy and calculation stability under different speeds or different track regularity states is studied. The influence of the track irregularity on the integration time step is further analyzed by using the spectral characteristic of sensitive wavelength. According to the results, the disparity among the effect of the integration time step on the calculation accuracy of the VTB coupled model at different speeds is very small. Higher speed requires a smaller integration time step to keep the calculation results stable. The effect of the integration time step on the calculation stability of the maximum vertical acceleration of each component at different speeds is somewhat different, and the mechanism of the effect of the integration time step on the calculation stability of the vehicle-track-bridge coupled system is that corresponding displacement at the integration time step is different. The calculation deviation of the maximum vertical acceleration of the car body, wheel-sets and bridge under the track short wave irregularity state are greatly increased compared with that without track irregularity. The maximum vertical acceleration of wheel-sets, rails, track slabs and the bridge under the track short wave irregularity state all show a significant declining trend. The larger the vibration frequency is, the smaller the range of integration time step is for dynamic calculation.


Author(s):  
Ye Liu ◽  
Yan Han ◽  
Peng Hu ◽  
C. S. Cai ◽  
Xuhui He

In this study, the influences of wind barriers on the aerodynamic characteristics of trains (e.g. a CRH2 train) on a highway-railway one-story bridge were investigated by using wind pressure measurement tests, and a reduction factor of overturning moment coefficients was analyzed for trains under wind barriers. Subsequently, based on a joint simulation employing SIMPACK and ANSYS, a wind–train–track–bridge system coupled vibration model was established, and the safety and comfort indexes of trains on the bridge were studied under different wind barrier parameters. The results show that the mean wind pressures and fluctuating wind pressures on the trains’ surface decrease generally if wind barriers are used. As a result, the dynamic responses of the trains also decrease in the whole process of crossing the bridge. Of particular note, the rate of the wheel load reductions and lateral wheel-axle forces can change from unsafe states to relative safe states due to the wind barriers. The influence of the porosity of the wind barriers on the mean wind pressures and fluctuating wind pressures on the windward sides and near the top corner surfaces of the trains are significantly greater than the influence from the height of the wind barriers. Within a certain range, decreasing the wind barrier porosities and increasing the wind barrier heights will significantly reduce the safety and comfort index values of trains on the bridge. It is found that when the porosity of the wind barrier is 40%, the optimal height of the wind barrier is determined as approximately 3.5[Formula: see text]m. At this height, the trains on the bridges are safer and run more smoothly and comfortably. Besides, through the dynamic response analysis of the wind–train–track–bridge system, it is found that the installation of wind barriers in cases with high wind speeds (30[Formula: see text]m/s) may have an adverse effect on the vertical vibration of the train–track–bridge system.


Author(s):  
Yulin Feng ◽  
Yu Hou ◽  
Lizhong Jiang ◽  
Wangbao Zhou ◽  
Jian Yu ◽  
...  

The track irregularity spectrum of longitudinally connected ballastless track (LCBT)-bridge systems of high-speed railway was proposed in this paper. First, a simulation model of an LCBT-continuous girder bridge was established by considering the influences of approach bridges and subgrade with track structure. Further, a large number of sample analyses were carried out by taking into account the uncertainty of LCBT-bridge systems and stochastic behaviors of ground motions based on the simulation model. The damage laws of residual deformation of track-bridge system after earthquake actions were studied. Then, an interlayer deformation coordination relationship (IDCR) considering the track irregularity caused by earthquake-induced damage of bearings was developed, and the superposed track irregularity samples were obtained. Finally, by using the improved Blackman–Turkey method and Levenberg–Marquardt algorithm, the LCBT irregularity spectrum, track irregularity spectrogram, track irregularity limit spectrum, and a fitting formula for the track irregularity spectrum on a bridge after the action of earthquakes were obtained. Results obtained from the fitting formula and IDCR were compared, and they indicated that tracks undergone significant high-frequency irregularity diseases after the earthquake action. It was found that the track irregularity spectrum could be roughly divided into three ranges: high-, medium- and low-frequency wavebands. Consequently, this led to an application of a three-segment power function for the fitting of the track irregularity spectrum after the earthquake action. The track irregularity spectrum after the action of earthquakes provides an important theoretical basis for the establishment of seismic design methods for high-speed railway bridges based on the traffic safety performance.


2018 ◽  
Vol 18 (03) ◽  
pp. 1850035 ◽  
Author(s):  
Zhihui Zhu ◽  
Lidong Wang ◽  
Zhiwu Yu ◽  
Wei Gong ◽  
Yu Bai

This paper presents a non-stationary random vibration analysis of railway bridges under moving heavy-haul trains by the pseudo-excitation method (PEM) considering the train-track-bridge coupling dynamics. The train and the ballasted track-bridge are modeled by the multibody dynamics and finite element (FE) method, respectively. Based on the linearized wheel-rail interaction model, the equations of motion of the train-ballasted track-bridge coupling system are then derived. Meanwhile, the excitations between the rails and wheels caused by the random track irregularity are transformed into a series of deterministic pseudo-harmonic excitation vectors by the PEM. Then, the random vibration responses of the coupling system are obtained using a step-by-step integration method and the maximum responses are estimated using the 3[Formula: see text] rule for the Gaussian stochastic process. The proposed method is validated by the field measurement data collected from a simply-supported girder bridge (SSB) for heavy-haul trains in China. Finally, the effects of train speed, grade of track irregularity, and train type on the random dynamic behavior of six girder bridges for heavy-haul railways are investigated. The results show that the vertical acceleration and dynamic amplification factor (DAF) of the midspan of the SSB girders are influenced significantly by the train speed and track irregularity. With the increase in the vehicle axle-load, the vertical deflection-to-span ratio ([Formula: see text]) of the girders increases approximately linearly, but the DAF and vertical acceleration fail to show clear trend.


Sign in / Sign up

Export Citation Format

Share Document