2019 ◽  
Vol 11 (24) ◽  
pp. 7229
Author(s):  
Guofeng Ma ◽  
Jianyao Jia ◽  
Tiancheng Zhu ◽  
Shan Jiang

In order to overcome the difficulty in quantifying rework by traditional project schedule management tools, this study proposes an innovative method, namely improved Critical Chain Design Structure Matrix (ICCDSM). From the perspective of information flow, the authors firstly make assumptions on activity parameters and interactions between activities. After that, a genetic algorithm is employed to reorder the activity sequence, and a banding algorithm with consideration of resource constraints is used to identify concurrent activities. Then potential criticality is proposed to measure the importance of each activity, and the rework impact area is implicated to indicate potential rework windows. Next, two methods for calculating project buffer are employed. A simulation methodology is used to verify the proposed method. The simulation results illustrate that the ICCDSM method is capable of quantifying and visualizing rework and its impact, decreases iterations, and improves the completion probability. In this vein, this study provides a novel framework for rework management, which offers some insights for researchers and managers.


2013 ◽  
Vol 791-793 ◽  
pp. 1423-1426
Author(s):  
Hai Min Wei ◽  
Rong Guang Liu

Project schedule management is the management to each stage of the degree of progress and project final deadline in the project implementation process. Its purpose is to ensure that the project can meet the time constraints under the premise of achieving its overall objectives.When the progress of schedule found deviation in the process of schedule management ,the progress of the plan which have be advanced previously need to adjust.This article mainly discussed to solve the following two questions:establish the schedule optimization model by using the method of linear;discuss the particle swarm optimization (PSO) algorithm and its parameters which have effect on the algorithm:Particle swarm optimization (PSO) algorithm is presented in the time limited project and the application of a cost optimization.


2012 ◽  
Vol 594-597 ◽  
pp. 2976-2981
Author(s):  
Qing Lin Yi ◽  
Juan Juan Wu ◽  
Tian Fan Dai

The reliability of schedule management directly affects the project cost and quality. Time limit is the most important part in schedule management. The determination of reasonable time limit can save cost for investors, and ensure project quality .Based on this characteristic, this paper adopts utility curve to carry out risk analysis for risk factors, eliminates unreliable construction period and carries on fuzzy comprehensive evaluation for the rest of the possible period. Then it got scientific and reasonable time limit. The method can determine the construction period credibly and is used to guide engineering practical.


Sign in / Sign up

Export Citation Format

Share Document