Application of Fuzzy Comprehensive Evaluation Method Considering Risk Factors in Project Schedule Management
2012 ◽
Vol 594-597
◽
pp. 2976-2981
Keyword(s):
The reliability of schedule management directly affects the project cost and quality. Time limit is the most important part in schedule management. The determination of reasonable time limit can save cost for investors, and ensure project quality .Based on this characteristic, this paper adopts utility curve to carry out risk analysis for risk factors, eliminates unreliable construction period and carries on fuzzy comprehensive evaluation for the rest of the possible period. Then it got scientific and reasonable time limit. The method can determine the construction period credibly and is used to guide engineering practical.
2021 ◽
Vol 787
(1)
◽
pp. 012194
2021 ◽
Vol 636
◽
pp. 012029
2020 ◽
Vol 1549
◽
pp. 042055
2013 ◽
Vol 444-445
◽
pp. 1751-1755
2013 ◽
Vol 295-298
◽
pp. 2493-2499
◽
2013 ◽
Vol 361-363
◽
pp. 15-20
2016 ◽
Vol 8
(4)
◽
pp. 344-359
◽
2018 ◽
Vol 108
◽
pp. 042073
◽