Sampling Inspection Plans for Continuous Production which Insure a Prescribed Limit on the Outgoing Quality
1945 ◽
Vol 16
(1)
◽
pp. 30-49
◽
The study of the conformity criterion for compressive strength of concrete based on order statistics
2013 ◽
Vol 12
(3)
◽
pp. 223-230
◽
2005 ◽
Vol 12
(02)
◽
pp. 75-93
1943 ◽
Vol 14
(3)
◽
pp. 264-279
◽
1993 ◽
Vol 449
(0)
◽
pp. 117-126
◽
Keyword(s):