Flood Regulation Analysis of Lower Reservoir of Jixi Pumped-Storage Power Station

2020 ◽  
Vol 09 (01) ◽  
pp. 115-120
Author(s):  
娜 钟
2013 ◽  
Vol 353-356 ◽  
pp. 2822-2826
Author(s):  
Jun Xing ◽  
Zhi Xin Fan

During the construction of pre-stressed anchor cables for discharging flood and sand in the lower reservoir of Pushihe Pumped-storage Power Station, the tensioning of main and secondary cables are overall carried out according to design, in which the tensioning force is divided into seventh grades, the indicator values of ergometer and tensioning force of jack were obtained by experiment, and the difference between them were compared and analysis, the results of experiment provides the basis for the long-term and stable operation of pre-stressed pier in Pushihe project.


2020 ◽  
Vol 1635 ◽  
pp. 012042
Author(s):  
Yunpeng Gao ◽  
Xuechao Zhang ◽  
Lu Cheng ◽  
Wenxuan Fang ◽  
Feng Yun
Keyword(s):  

2021 ◽  
Vol 692 (2) ◽  
pp. 022015
Author(s):  
Mingjie Xie ◽  
Chuanzheng Gong ◽  
Tongfa Chen ◽  
Ligang Pan ◽  
Qingran Wang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document