Optimizing resource-constrained project probabilistic scheduling problem through a combination of simulation and meta-heuristic algorithm (Case study: Govah Sanat Company)

Author(s):  
Shahab Amelian ◽  
Maryam Ghasemifard
2012 ◽  
Vol 39 (11) ◽  
pp. 2564-2577 ◽  
Author(s):  
Mojtaba Shakeri ◽  
Malcolm Yoke Hean Low ◽  
Stephen John Turner ◽  
Eng Wah Lee

Sign in / Sign up

Export Citation Format

Share Document