Development of Process for Reconfiguring the Faulted Distribution Network for Minimizing Loads without Electric Power Supply

2013 ◽  
Vol 133 (7) ◽  
pp. 623-630 ◽  
Author(s):  
Naoyuki Jin ◽  
Masahiro Sato
2019 ◽  
Vol 2 (2) ◽  
pp. 29-35
Author(s):  
C. Agbeboaye ◽  
F. O. Akpojedje ◽  
B. I. Ogbe

The issue of erratic and epileptic power supply in Nigeria Electricity Company is as old as the country itself. This is not unconnected to some factors such as: inadequate power generated in the national grid, electric power losses in the distribution network, government instability and unstable power reform policies, to mention but a few. The effects of erratic and epileptic power supply have been a major challenge to every sector in Nigeria especially the telecommunication industry. The telecommunication industry plays a significant role in the growth and development of every nation. Hence, this paper aims at critically investigating the causes and effects of erratic and epileptic electric power supply in Nigerian telecommunication industry. More so, the paper suggested and recommended ways to curb and enhance the current erratic and epileptic power situation in the country in order to boost the productivity of telecommunication industry and other sectors as well.


2018 ◽  
pp. 19-27
Author(s):  
BAGAUDIN Kh. GAITOV ◽  
◽  
Yakov M. KASHIN ◽  
Lev E. KOPELEVICH ◽  
Aleksandr V. SAMORODOV ◽  
...  

1919 ◽  
Vol 207 (1919) ◽  
pp. 63-86
Author(s):  
SIR J A F ASPINALL ◽  
A DICKINSON ◽  
R M PARKINSON ◽  
W L S L CAMERON ◽  
C S MEIK ◽  
...  

2001 ◽  
Vol 14 (3) ◽  
pp. 22-30 ◽  
Author(s):  
G.T. Heydt ◽  
C.C. Liu ◽  
A.G. Phadke ◽  
V. Vittal

2014 ◽  
Vol 627 ◽  
pp. 357-364 ◽  
Author(s):  
Goran Radovic ◽  
Vera Murgul ◽  
Nikolai Vatin ◽  
Ekaterina Aronova

The article deals with the concept of solar photovoltaic systems use in power supply systems. An analysis of local solar resources potential has been carried out, and optimal orientation points of radiant heat absorbing photovoltaic panels have been chosen to achieve maximum energy performance. Simulation of electric power systems having different configurations has been implemented using the software program Homer. It has been stated that a combination of solar and diesel energy systems is considered to be an optimal solution under the weather conditions of Montenegro. The systems working together make it possible to reduce maintenance costs significantly and adjust capacity generation schedule with due account for energy consumption features to a maximum extent. This allows generating electric power at less cost and results in a more reliable and continuous power supply without failures for a consumer chosen.


Sign in / Sign up

Export Citation Format

Share Document