Chapter 63. Integrated Management of the Sick Child

2019 ◽  
Vol 6 (3) ◽  
pp. 1102
Author(s):  
Javaid Iqbal ◽  
Tarsem Lal Motten ◽  
Ashu Jamwal ◽  
Pallvi Sharma

Background: The present study was designed to evaluate the feasibility and utility of the integrated management of the childhood illness (IMCI) algorithm to diagnose the illnesses in children under the age of 2 months to 5 years.Methods: The study was conducted on 300 children, aged 2 months to 5 years, who presented with a fresh episode of any illness to the out-patient Department of the SMGS Hospital over a period of 9 months. Within these initial selection criteria, the WHO/UNICEF algorithm for management of the sick child was referred to, children were assessed and classified as per "IMCI" algorithm and treatments required were identified. The final diagnosis was made and appropriate therapy instituted served as the "Gold standard". The diagnostic and therapeutic agreements between the 'gold standard' and the IMCI and vertical (on the basis of primary presenting complaint) algorithms were computed.Results: Among all 300 subjects, more than one illness was present in 207 (69%) of subjects as per Gold standard diagnosis. The corresponding, figures for IMCI module were 141 (47%) and 222 (74%) for low and high malaria algorithms respectively. The mean illnesses per child were 2.12, 182 and 2.21, respectively. The subjects who would have been referred as per IMCI module had a greater co-existence of illnesses than those who would not have been referred (mean 2.5 versus 1.5 illnesses per child respectively). The specificity for general danger signs was 66% while the sensitivity was 71%.Conclusions: In conclusion, the performance of the IMCI algorithm is significantly better than the vertical disease specific algorithm. In addition, the IMCI algorithm incorporates an element of preventive care in the form of immunization and feeding advice.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2020 ◽  
Vol 26 (3) ◽  
pp. 14-19
Author(s):  
Laurențiu Bogdan Asalomia ◽  
Gheorghe Samoilescu

AbstractThe paper analyzes, starting from the Integrated Management System, the role of automation, the role of the officer and the role of the Energy Management System on board the ship. The implementation of an EnMS establishes the structure and discipline of identifying energy flows, implementing management actions and, finally, applying technical solutions, which significantly reduce energy costs, reduce non-productive time in production, and reduce emissions. of Greenhouse Gases in the environment. The steps to be highlighted in the realization of energy management are analyzed.


Sign in / Sign up

Export Citation Format

Share Document