Design and construction of a launched cable-stayed bridge in China
2019 ◽
Vol 172
(5)
◽
pp. 3-8
◽
2014 ◽
Vol 919-921
◽
pp. 1039-1042
2019 ◽
Vol 172
(2)
◽
pp. 135-144
◽
2009 ◽
Vol 96
(4)
◽
pp. 132-139
◽
2014 ◽
Vol 587-589
◽
pp. 1604-1607