Design and construction control of single tower cable-stayed bridge without backstays

Author(s):  
Haikuan Liu ◽  
Pinde Yu ◽  
Feng Hu ◽  
Xuetong Li
Author(s):  
Yingliang Wang ◽  
Xiaochun Dai ◽  
Tingguo He ◽  
Jianbing Dai ◽  
Jiachun Zhang

1992 ◽  
Vol 30 (2) ◽  
pp. 31-45
Author(s):  
Chikara Miyashita ◽  
Toru Fujiwara

2014 ◽  
Vol 919-921 ◽  
pp. 1039-1042
Author(s):  
Liang Lv ◽  
Bin Liang ◽  
Wen Sheng Wang

Seismic displacement response of cable stayed bridge without back stays was studied in this paper. Based on the cable stayed bridge without back stays on Zhenshui Road in Xinmi City, finite element method (FEM) was applied to calculate and analyze natural vibration and peak displacement response of the structure. The results show that with regard to mid-span and consolidation of pier and main tower, uniaxial seismic wave input results in peak displacement response of corresponding direction is bigger than that of any other direction. Peak displacement response of the top of the main tower is bigger than those of mid-span and consolidation of pier and main tower in any seismic wave input cases, which indicates that the top of the tower needs to be focused in the process of design and construction. Seismic wave along triaxial direction has the biggest impact on the structure. Keywords: cable stayed bridge without back stays; seismic displacement response; seismic wave input; peak displacement response


2010 ◽  
Vol 163-167 ◽  
pp. 1696-1701
Author(s):  
Yu Feng Xu

As the stress measurement of interior concrete is hard in the construction control of the cable- stayed bridge, a new method fitted for stress measurement in large span PC concrete cable-stayed bridge is proposed in this paper. This method is based on the principle that the normal stress in neutron-axis of girder is only decided by the horizontal part of the cable force. First, the normal stress on the neutron-axis of girder is calculated by the measured cable force, and then the creep coefficient is identified, and finally the other stresses are worked out. This method has been applied to a large span PC cable-stayed bridge constructed in process with favourable results and thus proves its accuracy and efficiency.


2012 ◽  
Vol 517 ◽  
pp. 817-823
Author(s):  
Zhong San Li ◽  
Jun Qing Lei ◽  
Dong Huang Yan

In order to improve the construction control precision of long-span hybrid girder cable-stayed bridge, the design parameters such as the weight of girder, the cable tensile force and the stiffness of cable are conducted sensitivity analysis through computing and comparing the influences of these parameters on the deflection of girders, the stress of girders and the cable force in the bridge's completion state. It was shown by the computation results that the main parameters of long-span hybrid girder cable-stayed bridge are the weight of girder and the cable tensile force, the stiffness of cable has a little influence on the completion state of the bridge. With this approach, through modifying the main parameters, while ignoring the influences of the secondary ones, the Jingyue Yangtze River Highway Bridge construction control has been successfully done. The test results show that the cable force and the contour of the bridge are in good state. They are both in the range of control, the relative error of the cable force is less than 3% and the elevation deviation is less than 5mm.


2001 ◽  
Vol 84 (4) ◽  
pp. 47-54
Author(s):  
Ahmed Fouad ◽  
Nawal Taha ◽  
Sanyout Shaker ◽  
Mourad M. Bakhoum ◽  
Narikazu Onuma ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document