Development of Mobile Water Treatment Package System for Emergency Water Supply

Author(s):  
Young Kyu Park ◽  
◽  
Ju-Suk An ◽  
Jiyoung Park ◽  
Hyun Je Oh
Author(s):  
Ju-Suk An ◽  
Young Kyu Park ◽  
Ji Young Park ◽  
Woosik Jung ◽  
Hyun Je Oh

Author(s):  
Christoph Stallkamp ◽  
Florian Diehlmann ◽  
Markus Lüttenberg ◽  
Marcus Wiens ◽  
Rebekka Volk ◽  
...  

Abstract A shortage of water leads to severe consequences for populations. Recent examples like the ongoing water shortage in Kapstadt or in Gloucestershire in 2007 highlight both the challenges authorities face to restore the water supply and the importance of installing efficient preparedness measures and plans. This study develops a proactive planning approach of emergency measures for possible impairments of water supply systems and validates this with a case study on water contamination in the city of Berlin. We formulate a capacitated maximal covering problem as a mixed-integer optimization model where we combine existing emergency infrastructure with the deployment of mobile water treatment systems. The model selects locations for mobile water treatment systems to maximize the public water supply within defined constraints. With the extension to a multi-objective decision making model, possible trade-offs between the water supply coverage and costs, and between the coverage of differently prioritized demand points are investigated. Therefore, decision makers benefit from a significantly increased transparency regarding potential outcomes of their decisions, leading to improved decisions before and during a crisis.


2019 ◽  
pp. 51-60
Author(s):  
S.I. Epshtein ◽  
◽  
S.E. Nikulin ◽  
Yu.A. Shliakhova ◽  
A.I. Kondratenko ◽  
...  
Keyword(s):  

1998 ◽  
Vol 37 (2) ◽  
pp. 35-42 ◽  
Author(s):  
M. J. Bauer ◽  
R. Bayley ◽  
M. J. Chipps ◽  
A. Eades ◽  
R. J. Scriven ◽  
...  

Thames Water treats approximately 2800Ml/d of water originating mainly from the lowland rivers Thames and Lee for supply to over 7.3million customers, principally in the cities of London and Oxford. This paper reviews aspects of Thames Water's research, design and operating experiences of treating algal rich reservoir stored lowland water. Areas covered include experiences of optimising reservoir management, uprating and upgrading of rapid gravity filtration (RGF), standard co-current dissolved air flotation (DAF) and counter-current dissolved air flotation/filtration (COCO-DAFF®) to counter operational problems caused by seasonal blooms of filter blocking algae such as Melosira spp., Aphanizomenon spp. and Anabaena spp. A major programme of uprating and modernisation (inclusion of Advanced Water Treatment: GAC and ozone) of the major works is in progress which, together with the Thames Tunnel Ring Main, will meet London's water supply needs into the 21st Century.


2021 ◽  
Vol 3 (3) ◽  
Author(s):  
Anne Louise de Melo Dores ◽  
Felipe Corrêa Veloso dos Santos

AbstractTo elaborate efficient and economical water supply systems is one of the main objectives in the sanitation companies water system projects. In order to address the challenges faced in reaching this objective, this study aims to identify, first, the relation between the percentage of non-conformed samples in treated water and the inefficiency of the filtering units installed in the water treatment plant, and second, if, by drawing the consumption variation curve it is the most efficient way to predict the storage tanks volume—comparing necessary capacity, determined by the consumption curve, and installed capacity, predict by the outdated Brazilian normative. In order to reach answers for these two questions, this study measured the operating efficiency of the treatment plant as well as have set a quantitative comparison between the two dimensioning criteria for storage tanks volume present in the literature. As a result, the analysis provided the authors to detect a focus of contamination in the single-layered filtering units, limited by the filtering capacity of 2–6 m3/(m2 day), whilst operating at 333.13 m3/(m2 day). As well as to detect by the drawing of the consumption variation curve an oversize of 68% and 60% in the dimensioning of the studied storage tanks. With the results provided by this analysis approach, it was possible to efficiently detect and correct critical impairments in the treatment phase and to conclude that a long-term analysis should be drawn in order to affirm if the consumption variation curve is the best design methodology for the reservoirs.


2016 ◽  
Vol 16 (4) ◽  
pp. 922-930 ◽  
Author(s):  
L. Richard ◽  
E. Mayr ◽  
M. Zunabovic ◽  
R. Allabashi ◽  
R. Perfler

The implementation and evaluation of biological nitrification as a possible treatment option for the small-scale drinking water supply of a rural Upper Austrian community was investigated. The drinking water supply of this community (average system input volume: 20 m3/d) is based on the use of deep anaerobic groundwater with a high ammonium content of geogenic origin (up to 5 mg/l) which must be treated to prevent the formation of nitrites in the drinking water supply system. This paper describes the implementation and operation of biological nitrification despite several constraints including space availability, location and financial and manpower resources. A pilot drinking water treatment plant, including biological nitrification implemented in sand filters, was designed and constructed for a maximum treatment capacity of 1.2 m3/h. Online monitoring of selected physicochemical parameters has provided continuous treatment performance data. Treatment performance of the plant was evaluated under standard operation as well as in the case of selected malfunction events.


1999 ◽  
Vol 48 (5) ◽  
pp. 177-185 ◽  
Author(s):  
O. Griffini ◽  
M. L. Bao ◽  
D. Burrini ◽  
D. Santianni ◽  
C. Barbieri ◽  
...  