scholarly journals SIMULASI RANCANGAN TEKNIS DAN PENJADWALAN PENAMBANGAN DENGAN METODE BLOCK STRIP MINING

2021 ◽  
Vol 7 (2) ◽  
pp. 115
Author(s):  
Masjon Parhusip ◽  
Waterman Sulistyana Bargawa ◽  
Tedy Agung Cahyadi
Keyword(s):  
2009 ◽  
Vol 20 (9) ◽  
pp. 2320-2331
Author(s):  
Jing DU ◽  
Fu-Jiang AO ◽  
Tao TANG ◽  
Xue-Jun YANG

2016 ◽  
Author(s):  
Patrick Hawkins ◽  
◽  
Jenna Graham ◽  
Rona J. Donahoe ◽  
Natasha Dimova
Keyword(s):  

2012 ◽  
Vol 616-618 ◽  
pp. 406-410
Author(s):  
Gui Liu ◽  
Hua Xing Zhang ◽  
Jin Hui Chen ◽  
Chao Gao

By making full use of the advantages of strip mining method and full-pillar mining method, the wide strip and full-pillar mining method can achieve the aim of mining under villages. However, at the full-pillar mining stage, the difficulty in managing several workfaces which are at work at the same time still exists. To improve the wide strip and full-pillar mining method’s applicability, an optimization of extraction sequence for coal pillars instead of the multi-working-face is put forward at the stage of full-pillar mining, and in the case of the deformation limit of surface structures is satisfied, to extract all the coal pillars which are under villages. By specific analysis of the extraction sequence optimization of the coal pillars in No.1 mine under Qian Xudapo village which belongs to Chang Chun coal Co., LTD., a better result is got which also acts a technological reference for the extraction under villages.


1971 ◽  
Vol 14 (3) ◽  
pp. 0434-0436 ◽  
Author(s):  
Willie R. Curtis
Keyword(s):  

Science ◽  
1965 ◽  
Vol 150 (3698) ◽  
pp. 871-871
Author(s):  
J. Walsh
Keyword(s):  

2018 ◽  
Vol 18 (7) ◽  
pp. 05018003 ◽  
Author(s):  
Tongbin Zhao ◽  
Shuqi Ma ◽  
Zhenyu Zhang
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document