mining operations
Recently Published Documents


TOTAL DOCUMENTS

1610
(FIVE YEARS 767)

H-INDEX

28
(FIVE YEARS 6)

Author(s):  
O.I. Litvin ◽  
Ya.O. Litvin ◽  
M.A. Tyulenev ◽  
S.O. Markov

The backhoe hydraulic shovels (backhoes) have been widely used in open-pit mining operations in the Kuznetsk coal basin since the early 2000s. Now their number is growing every year, both because new operations begin on new sites, and because of the backhoe advantages. However, up to now parameters of their operation, more particularly the parameters of the face blocks, are often taken according to the actual data, i.e. based on the accumulated experience of the mining companies, and are not calculated using the approved scientifically validated methods. In the given article the authors give some preconditions for creation of a uniform methodology to calculate parameters of the face blocks depending on mining-geological and miningtechnical conditions. It is noted that the manufacturers of excavation equipment quote the data corresponding to the maximum possible parameters of the equipment operation, in particular the height of the excavated layer, as a result of which it is rather difficult to apply this in practice. Preliminary conclusions about the need to take into account the diversity of the above conditions and their interrelation with the parameters of a particular model of the excavation and loading equipment have been made.


Author(s):  
M.V. Zalesov ◽  
V.A. Grigoreva ◽  
V.S. Trubilov ◽  
A.Ya. Boduen

It is important for mining dump trucks to minimize the weight of the carrier and the load platform while maintaining a sufficient level of their rigidness and strength. This requirement significantly affects the weight of the transported material, the cost of transportation and, consequently, the economic efficiency of mining operations. Processes of loading and dumping of bulk loads, which is transported by dump trucks, make a significant contribution to reducing the service life of the carrier. Therefore, proper consideration of the bulk load dynamics is an important and relevant task. Contemporary systems for calculating the dynamics of solids allow for joint modeling with applications designed to calculate the dispersed body dynamics. This approach helps to obtain adequate loads in the pivots and force links of the model, to analyze the loading of the load platform, to asses the durability of the dump truck elements, to define the geometry of the load platform. In order to perform the simulation, it is required to develop a mathematical model of a dump truck, including all its key elements and subsystems, a model of the bulk load, and a model of the load platform. The purpose of the study is to develop a mathematical model of a mine dump truck to determine the loads in the pivots and force links connected to the carrier and the load platform for the strength calculations and durability analysis. The calculations are made with the combined use of the solids dynamics calculation system and the application to calculate the dynamics of dispersed bodies.


Author(s):  
I.A. Pytalev ◽  
D.V. Domozhirov ◽  
E.E. Shvabenland ◽  
A.A. Prokhorov ◽  
V.V. Pronin

Increasing the production capacity of open-pit and strip mines while ensuring the efficiency of the mining enterprise can be achieved through enhancing the quality of rock preparation prior to excavation. The use of emulsion explosives and the transition to the high-bench technology can reduce the cost of mining operations by optimizing the drilling and blasting parameters. The article reviews methods to improve the efficiency of rock preparation for extraction based on the applicable scientific and methodological principles and it proposes a method to regulate the density of emulsion explosives. Schemes are presented for calculation of drilling and blasting parameters when implementing technical measures aimed at improving the blasting quality through rock preparation for extraction in conditions of overburden and mining operations with bench height of 15 m and higher. Parameters of drilling and blasting operations on high benches are justified with differentiation of the charge density along the length of the blast hole by controlling the delivery of the gas-generating additive. A simulation has been performed and the results of pilot tests of the emulsion explosive charge density control at the Ural deposits are presented.


2022 ◽  
Vol 0 (0) ◽  
Author(s):  
Prasanth Bhatt ◽  
Swamynathan Ganesan ◽  
Infant Santhose ◽  
Thirumurugan Durairaj

Abstract Phytoremediation is a process which effectively uses plants as a tool to remove, detoxify or immobilize contaminants. It has been an eco-friendly and cost-effective technique to clean contaminated environments. The contaminants from various sources have caused an irreversible damage to all the biotic factors in the biosphere. Bioremediation has become an indispensable strategy in reclaiming or rehabilitating the environment that was damaged by the contaminants. The process of bioremediation has been extensively used for the past few decades to neutralize toxic contaminants, but the results have not been satisfactory due to the lack of cost-effectiveness, production of byproducts that are toxic and requirement of large landscape. Phytoremediation helps in treating chemical pollutants on two broad categories namely, emerging organic pollutants (EOPs) and emerging inorganic pollutants (EIOPs) under in situ conditions. The EOPs are produced from pharmaceutical, chemical and synthetic polymer industries, which have potential to pollute water and soil environments. Similarly, EIOPs are generated during mining operations, transportations and industries involved in urban development. Among the EIOPs, it has been noticed that there is pollution due to heavy metals, radioactive waste production and electronic waste in urban centers. Moreover, in recent times phytoremediation has been recognized as a feasible method to treat biological contaminants. Since remediation of soil and water is very important to preserve natural habitats and ecosystems, it is necessary to devise new strategies in using plants as a tool for remediation. In this review, we focus on recent advancements in phytoremediation strategies that could be utilized to mitigate the adverse effects of emerging contaminants without affecting the environment.


Author(s):  
N.D. Iliinov ◽  
A.M. Mazhitov ◽  
A.B. Allaberdin ◽  
K.V. Vazhdaev

Currently, many underground mines are revising their design solutions to increase their production capacity. This tendency is explained by the decreasing ore grades, as well as by the extensive introduction of mechanization in underground mining operations that has improved the output of mobile equipment by increasing the box capacity and engine power. Dieselpowered mobile vehicles are the most common in underground mining practice. The advantages of such engines are obvious as they generate more power than other types of engines. However, the high air demand for mine ventilation limits their application. This is associated with the need to increase the cross-sections of permanent mine workings in order to comply with the standard air flow rate with account of the increased ventilation capacity along with an increase in the inventory of mobile equipment in order to ensure the specified output of the mine. The specific features of mining operations are defined by the stage-wise character of commissioning various blocks of the deposit. Managing of production and development works provides an opportunity to ventilate the mine sections due to their consecutive commissioning, locally, with an isolated stream of air by means of mine workings that do not have the intersection of air streams. This provides a reduction of critical path of air travel up to 30% and reduction of the general mine ventilating pressure drop by at least 20% at constant air flow rate. The results of the work can be used in designing the ventilation system of underground mines both under construction and in operation.


Plants ◽  
2022 ◽  
Vol 11 (2) ◽  
pp. 179
Author(s):  
Meryem El Berkaoui ◽  
Mariam El Adnani ◽  
Rachid Hakkou ◽  
Ahmed Ouhammou ◽  
Najib Bendaou ◽  
...  

The abandoned Kettara pyrrhotite mine (Marrakech region, Morocco) is a real source of acid mine drainage (AMD) and heavy metal pollution from previous mining operations—which has spread, particularly because of wind erosion. A store-and-release cover system made of phosphate wastes was built on the site for preventing AMD. To ensure the integrity of this cover and its durability, it is desirable to revegetate it (phytostabilization) with plants adapted to the edaphoclimatic conditions of the region. In this paper, a study was carried out on the spontaneous vegetation around the phosphate cover in order to consider the selection of plants to promote the stabilization of the Kettara mine tailings pond. Nine species of native plants with their rhizospheric soils growing in agricultural soils and tailings from the Kettara mine were collected, and metals (As, Cd, Co, Cu, Pb, Zn, Ni, Cr) were analyzed. The soil analysis showed that the tailings contained high concentrations of Cu (177.64 mg/kg) and Pb (116.80 mg/kg) and that the agricultural soil contained high concentrations of As (25.07 mg/kg) and Cu (251.96 mg/kg) exceeding the toxicity level (Cu > 100 mg/kg, Pb > 100 mg/kg, As > 20 mg/kg). The plant analysis showed low trace metal accumulation in Scolymus hispanicus, Festuca ovina, Cleome brachycarpa, Carlina involucrata and Peganum harmala. These species had a bioconcentration factor (BCF) greater than 1 and a translocation factor (TF) less than 1, demonstrating a high tolerance to trace metals. Therefore, they are good candidates for use in the phytoremediation of the Kettara mine tailings. These species could also potentially be used for the phytostabilization of the phosphate waste cover of the Kettara mine, thus completing the rehabilitation process of this area.


Water ◽  
2022 ◽  
Vol 14 (2) ◽  
pp. 165
Author(s):  
Alexander I. Malov ◽  
Evgeniya S. Sidkina ◽  
Mikhail V. Mironenko ◽  
Alexey S. Tyshov ◽  
Elena V. Cherkasova

The technogenic impact of the development of the Lomonosov diamond deposit is associated with the discharge of quarry and drainage water into the river, which has a special conservation status. Earlier studies on the composition of bottom sediments showed that there are signs of increased accumulation of heavy metals and radionuclides at wastewater discharge sites. The purpose of this work was to predict changes in the composition of surface water and bottom sediment in the river during the further development of mining operations with brackish and salty water captured by drainage systems, the presence of which was established in the zone of their future influence. For this, a simulation of changes in the composition of the water in the river was carried out using the GEOCHEQ software package by minimizing the free energy of the system using a convex simplex algorithm. It was found that the maximum salinity of surface water can reach 1.51 g/L. In this case, the MPC of Cl−, Na+, SO42−, Mg2+, Sr, V, and U can be exceeded for fishery watercourses. The genetic basis of the accumulation of these components in solutions for mixing was considered. According to the calculations, when about 5000 m3/h of drainage water is discharge d into the river, the mass of precipitated chemical elements will be 56–191 t/h, including up to 2.1 t/h of iron; therefore, accumulation in the discharge zone must be controlled.


2022 ◽  
Vol 14 (2) ◽  
pp. 635
Author(s):  
Ahmed M. A. Shohda ◽  
Mahrous A. M. Ali ◽  
Gaofeng Ren ◽  
Jong-Gwan Kim ◽  
Mohamed Abd-El-Hakeem Mohamed

Decision-making is very important in many fields, such as mining engineering. In addition, there has been a growth of computer applications in all fields, especially mining operations. One of these application fields is mine design and the selection of suitable mining methods, and computer applications can help mine engineers to decide upon and choose more satisfactory methods. The selection of mining methods depends on the rock-layer specification. All rock characteristics should be classified in terms of technical and economic concerns related to mining rock specifications, such as mechanical and physical properties, and evaluated according to their weights and ratings. Methodologically, in this study, the criteria considered in the University of British Columbia (UBC) method were used as references to establish general criteria. These criteria consist of general shape, ore thickness, ore plunge, and grade distribution, in addition to the rock quality designation (ore zone, hanging wall, and foot wall) and rock substance strength (ore zone, hanging wall, and foot wall). The technique for order of preference by similarity to ideal solution (TOPSIS) was adopted, and an improved TOPSIS method was developed based on experimental testing and checked by means of the application of cascade forward backpropagation neural networks in mining method selection. The results provide indicators that decision makers can use to choose between different mining methods based on the total points given to all ore properties. The best mining method is cut and fill stopping, with a rank of 0.70, and the second is top slicing, with a rank of 0.67.


2022 ◽  
Vol 14 (2) ◽  
pp. 597
Author(s):  
Paula Godinho Ribeiro ◽  
Gabriel Caixeta Martins ◽  
Markus Gastauer ◽  
Ediu Carlos da Silva Junior ◽  
Diogo Corrêa Santos ◽  
...  

Rehabilitation is the key factor for improving soil quality and soil carbon stock after mining operations. Monitoring is necessary to evaluate the progress of rehabilitation and its success, but the use of repeated field surveys is costly and time-consuming at a large scale. This study aimed to monitor the environmental/soil rehabilitation process of an Amazonian sandstone mine by applying spectral indices for predicting soil organic carbon (SOC) stock and comparing them to soil quality index. The studied area has different chronological rehabilitation stages: initial, intermediate, and advanced with 2, 10, and 12 years of onset rehabilitation activities, respectively. Non-rehabilitated (NR) and two native forest areas (RA) were used as controls. Soil samples were analyzed for physical, chemical, and biological attributes. After determination of Normalized Difference Vegetation Index and Bare Soil Index, simple regression analysis comparing these indices with SOC stock showed a good fit (R2 = 0.82). Rehabilitated areas presented higher soil quality index (~1.50-fold) and SOC stock (~10.6-fold) than NR; however, they did not differ of RA. The use of spectral indices was effective for monitoring the soil quality in this study, with a positive correlation between the predicted SOC stock and the calculated soil quality index.


2022 ◽  
Vol 354 ◽  
pp. 00075
Author(s):  
Ciprian Trocan ◽  
Marian Mocan ◽  
Lucian-Ionel Cioca ◽  
Larisa Ivascu ◽  
Rebeca Ardelean

Global annual extraction has increased due to market demand. It is anticipated that this aspect will continue in the future. The mining industry is one of the important industries at national level. It also anticipates certain aspects of sustainability that must be seriously evaluated. The main objective of this paper is to evaluate mine waste reuse, pollution, and recycling in mining industries. At the same time, mining operations are evaluated to carry out a review of the implications for sustainability. In order to achieve the research aspects, a qualitative evaluation and a semi-quantitative evaluation of some data series are used. For the entire research approach, the objectives of sustainable development and its principles are used. At the same time, the results emphasize the importance of the existence of an efficient waste and pollution management.