Turning a High-Pressure, High-H2S Oil Carbonate Reservoir Development Viable Through Miscible Gas Injection in the Sultanate of Oman

2018 ◽  
Author(s):  
Ahmed Mourad ◽  
Mahmood Awadhi ◽  
Stephen Calvert ◽  
Karima Djermouni ◽  
Ahmed Hattali ◽  
...  
2006 ◽  
Author(s):  
Masoud Haajizadeh ◽  
Hafez H. Hafez ◽  
Rasheed Al Hassan ◽  
Abdulla Bakheet Al Katheeri ◽  
Muhamad Nepolian Ghozali ◽  
...  

2015 ◽  
Author(s):  
Abolfazl Hashemi ◽  
Bahram Miri ◽  
Reza Chegeni ◽  
Fatemeh Namdarian ◽  
Morteza Aghababee Taghanaki ◽  
...  

2021 ◽  
Author(s):  
Alfredo Freites ◽  
Victor Segura ◽  
Muhammad Muneeb

Abstract Maximum Reservoir Contact wells (MRCs) are a potential alternative to reduce the number of wells required to develop hydrocarbon reservoirs, improve sweeping efficiency and delay gas and water breakthrough. The well completions design is critical for the success of MRCs. In this study we present a case study of a MRC well completion design using Limited Entry Liners (LEL) in a mature carbonate reservoir under water and miscible gas injection. We developed an integrated workflow that considered a high-resolution numerical simulation model calibrated to static and dynamic data and wellbore-reservoir models coupling, for capturing the details of the flow interaction between both systems. Flow restrictions in the form of additional pressure drops to the flow from the reservoir into the wellbore were used to simulate the effect of small open flow areas, i.e.shot densities, in the LELs. Our work allowed identifying the most likely entry points of gas and water and design the well to minimize their impact on oil production. We observe that longer lengths open to flow outweighs the detrimental effect of producing from intervals closer to the water saturated zones. We also observed that balancing the inflow profile along the wellbore did not report beneficial results to oil production as it stimulates production from the reservoir zone from which the gas breakthrough is expected (middle of the producing section); this result is particularly relevant as it shows that designing the well completions with base only on static data could lead to poor production performance. The suggested completion for the MRC well encompasses four segments; a segment covering almost 50 % of the well length and located at the middle of the producing section with a blind liner (close to flow for gas control) and the remaining three with slotted liners with enough open area as to avoid causing significant pressure drops.


2017 ◽  
Author(s):  
Ahmed Mourad ◽  
Stephen Calvert ◽  
Karima Djermouni ◽  
Ahmed Hattali ◽  
Abdullah Nabhani ◽  
...  

Author(s):  
L.E. Zakharov ◽  
S. Putvinski ◽  
A.S. Kukushkin ◽  
R.A. Pitts ◽  
M. Sugihara ◽  
...  

2021 ◽  
Author(s):  
Valentina Zharko ◽  
Dmitriy Burdakov

Abstract The paper presents the results of a pilot project implementing WAG injection at the oilfield with carbonate reservoir, characterized by low efficiency of traditional waterflooding. The objective of the pilot project was to evaluate the efficiency of this enhanced oil recovery method for conditions of the specific oil field. For the initial introduction of WAG, an area of the reservoir with minimal potential risks has been identified. During the test injections of water and gas, production parameters were monitored, including the oil production rates of the reacting wells and the water and gas injection rates of injection wells, the change in the density and composition of the produced fluids. With first positive results, the pilot area of the reservoir was expanded. In accordance with the responses of the producing wells to the injection of displacing agents, the injection rates were adjusted, and the production intensified, with the aim of maximizing the effect of WAG. The results obtained in practice were reproduced in the simulation model sector in order to obtain a project curve characterizing an increase in oil recovery due to water-alternating gas injection. Practical results obtained during pilot testing of the technology show that the injection of gas and water alternately can reduce the water cut of the reacting wells and increase overall oil production, providing more efficient displacement compared to traditional waterflooding. The use of WAG after the waterflooding provides an increase in oil recovery and a decrease in residual oil saturation. The water cut of the produced liquid decreased from 98% to 80%, an increase in oil production rate of 100 tons/day was obtained. The increase in the oil recovery factor is estimated at approximately 7.5% at gas injection of 1.5 hydrocarbon pore volumes. Based on the received results, the displacement characteristic was constructed. Methods for monitoring the effectiveness of WAG have been determined, and studies are planned to be carried out when designing a full-scale WAG project at the field. This project is the first pilot project in Russia implementing WAG injection in a field with a carbonate reservoir. During the pilot project, the technical feasibility of implementing this EOR method was confirmed, as well as its efficiency in terms of increasing the oil recovery factor for the conditions of the carbonate reservoir of Eastern Siberia, characterized by high water cut and low values of oil displacement coefficients during waterflooding.


Sign in / Sign up

Export Citation Format

Share Document