Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Annual report
Mapping Intimacies
◽
10.2172/6866425
◽
1978
◽
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
◽
Annual Report
Get full-text (via PubEx)
Related Documents
Cited By
References
Engineer, design construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power: Phase I. Preliminary engineering; Phase II. Final design; Phase III. Construction. Annual report, March 1, 1979-February 29, 1980
10.2172/5641050
◽
1980
◽
Author(s):
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Phase Ii
◽
Pilot Plant
◽
Annual Report
◽
Phase Iii
◽
Design Phase
◽
Final Design
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I. Preliminary engineering
10.2172/6671401
◽
1979
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a Pressurized Fluidized Bed Pilot Plant using high sulfur coal for production of electric power. Phase I: Preliminary engineering quarterly report, March 1-May 31, 1978
10.2172/5450668
◽
1978
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a Pressurized Fluidized Bed Pilot Plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering. Quarterly report, June 1-August 31, 1978
10.2172/5367576
◽
1978
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
Get full-text (via PubEx)
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering technology support final report; turbine materials hot corrosion; erosion rig evaluation; test period July 1976--April 1977. Draft
10.2172/6807643
◽
1978
◽
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Hot Corrosion
◽
Pilot Plant
◽
Test Period
◽
Final Report
◽
Technology Support
◽
Engineering Technology
◽
Evaluation Test
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Quarterly report, September 1-November 30, 1977
10.2172/5905282
◽
1977
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a Pressurized Fluidized Bed Pilot Plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering. Quarterly report, September 1-November 30, 1978
10.2172/5442744
◽
1978
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
Get full-text (via PubEx)
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Technology support test results PFB heat exchanger fin and tube materials erosion rig evaluation test period July 1976--April 1977
10.2172/6771184
◽
1978
◽
Keyword(s):
Heat Exchanger
◽
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
◽
Test Period
◽
Technology Support
◽
Test Results
◽
Engineering Technology
◽
Evaluation Test
Get full-text (via PubEx)
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I, Preliminary Engineering, Phase II, Pilot Plant final design, Phase III, Construction. Quarterly report, September 1-November 30, 1979
10.2172/6508791
◽
1979
◽
Author(s):
Not Given Author
Keyword(s):
Phase I
◽
Electric Power
◽
Fluidized Bed
◽
Phase Ii
◽
Pilot Plant
◽
Phase Iii
◽
Design Phase
◽
Final Design
Get full-text (via PubEx)
Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase III: pilot-plant construction. Quarterly report, June 1-August 31, 1980
10.2172/6508827
◽
1980
◽
Author(s):
Keyword(s):
Electric Power
◽
Fluidized Bed
◽
Pilot Plant
◽
Phase Iii
◽
Plant Construction
Get full-text (via PubEx)
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close