Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering technology support final report; turbine materials hot corrosion; erosion rig evaluation; test period July 1976--April 1977. Draft
Keyword(s):
Phase I
◽