TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR® SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

2004 ◽  
Vol 2004 (8) ◽  
pp. 144-156
Author(s):  
Chester Yang ◽  
Gu Gaowei ◽  
Li Baowei ◽  
Li Hongyuan ◽  
Lu Wanshen ◽  
...  
2013 ◽  
Vol 641-642 ◽  
pp. 299-302 ◽  
Author(s):  
Yin Song Liu ◽  
Hong Jun Han ◽  
Chun Yan Xu ◽  
Bing Wang ◽  
Jian Feng Tan

Hydrolysis acidification / pre-denitrification biological aerated filter was adopted in a domestic wastewater treatment plant. The effluent was accorded with a standard in the Integrated Wastewater Discharge Standard(GB18918-2002), in which the effluent phosphorus was demanded below 0.5mg/L. Through analysis on the process biological phosphorus removal, biological method can be found to total phosphorus 1.5 mg/L. If you reach level to an emissions standards, phosphorus chemical experiment research, finally determined by strategy for the CN pool, point for adding potions FeCl3, dosing quantity for 35mg/L.


1996 ◽  
Vol 33 (1) ◽  
pp. 265-273 ◽  
Author(s):  
John Sørensen

Marselisborg WWTP is designed for 220,000 population equivalent as an AB process i.e. biosorption followed by a BIO-DENITRO plant. The plant was designed to remove nitrate in summer only. It was designed to remove phosphorus by pre-precipitation in the biosorption process and by simultaneous precipitation in the biological tanks. Introduction of an on-line control system for the nitrogen removal made it possible to remove nitrate all year to effluent values 1-3 mg N/l below the effluent standard of 8 mg N/l. The control system automatically introduced about 50% longer denitrification time in the tanks. During the last 4 years, the amount of filtered COD has through optimization increased from 65% to above 80% in relation to total COD. This in combination with the longer time without aeration in the biological tanks has made it possible to optimize biological phosphorus removal at the plant. It is possible to remove about 400 kg P/d biological out of about 500 kg P/d. Strategies to run the biological P removal simultaneously with the nitrogen removal in the same biological tanks has been tested. It seems possible to control the biological phosphorus removal by modifying the on-line control system for the nitrogen removal.


Sign in / Sign up

Export Citation Format

Share Document