A Novel Constructive Heuristic for Flowshop Group Scheduling Problems to Minimize Total Flow Time

Author(s):  
Xuan He ◽  
Yu-Fan Liu ◽  
Quan-Ke Pan ◽  
Yang Yu ◽  
Yuan-Zhen Li
2010 ◽  
Vol 37 (1) ◽  
pp. 199-212 ◽  
Author(s):  
Nasser Salmasi ◽  
Rasaratnam Logendran ◽  
Mohammad Reza Skandari

Author(s):  
Modrak Vladimir ◽  
Soltysova Zuzana ◽  
Semanco Pavol

The goal of mass customisation is to offer products tailored to the specific needs of the customers. Even though customers are aware that manufacturers need a certain time to produce and deliver customised products, the companies might guarantee that their products will arrive on time. Then, the objective of manufacturing managers is to minimise the total flow time of parts through the shop. One of the effective ways to reach this objective is to optimise schedules in order to satisfy the due date criterion, which plays a crucial role in the mass customisation environment. This paper, in the first part, outlines methodological tools to tackle the problem of shortening delivery times through scheduling and management of resources. In the second part of the paper, the proposed methodology framework through the theoretical example is applied.


Sign in / Sign up

Export Citation Format

Share Document