A Hybrid Metaheuristic Approach for Minimizing the Total Flow Time in A Flow Shop Sequence Dependent Group Scheduling Problem
Keyword(s):
Keyword(s):
2010 ◽
Vol 37
(1)
◽
pp. 199-212
◽
Keyword(s):
2012 ◽
Vol 66
(9-12)
◽
pp. 1563-1572
◽
Keyword(s):
2016 ◽
Vol 90
(1-4)
◽
pp. 93-107
◽
2015 ◽
Vol 87
◽
pp. 30-39
◽
Keyword(s):
Keyword(s):
2018 ◽
Vol 51
(4)
◽
pp. 680-698
◽
Keyword(s):
2020 ◽
Vol 286
(2)
◽
pp. 432-443
Keyword(s):