scholarly journals Implementing Elements of Last Planner® System in the Orchestra Wheel Method

2021 ◽  
Author(s):  
Natalia A. Cossio ◽  
Luis A. Salazar
Keyword(s):  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tarek Salama ◽  
Ahmad Salah ◽  
Osama Moselhi

Purpose The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction. Design/methodology/approach The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration. Features of proposed method are illustrated in a case example for tracking and control of modular projects. Findings Comparison between developed schedule and Monte Carlo simulation showed that baseline duration generated from simulation exceeds that produced by developed method by 12% and 10% for schedules with 50% and 90% confidence level, respectively. These percentages decrease based on interventions of members of project team in the LPS sessions. The case example results indicate that project is delayed 5% and experienced cost overrun of 2.5%. Originality/value Developed method integrated LPS, LSM and CCPM while using metrics for reliability assessment of linear schedules, namely, critical percent plan complete (PPCcr) and buffer index (BI). PPCcr and BI measure percentage of plan completion for critical activities and buffer consumption, respectively. The developed method provides a systematic procedure for forecasting look-ahead schedules using forecasting correction factor Δt and a newly developed tracking and control procedure that uses PPCcr and BI. Quantitative cost analysis is also provided to forecast and monitor project costs to prove the robustness of proposed framework.


Author(s):  
Gabriele Hofinger Jünge ◽  
Kristina Kjersem ◽  
Mikhail Shlopak ◽  
Erlend Alfnes ◽  
Lise Lillebrygfjeld Halse
Keyword(s):  

2020 ◽  
Vol 20 (1) ◽  
pp. 129-151 ◽  
Author(s):  
Fabrício Berger de Vargas ◽  
Carlos Torres Formoso

Resumo A abordagem de planejamento e controle da produção (PCP) baseada em zonas de trabalho tem como vantagem explicitar o fluxo de trabalho ao longo das unidades de produção, podendo ser associado ao Sistema Last Planner (LPS) e a modelos BIM 4D. Entretanto, ainda existem algumas lacunas de conhecimento, tanto práticas como teóricas, referentes à implementação desta abordagem, principalmente relativas à aplicação de conceitos e princípios da filosofia da produção enxuta e a interação destes com as funcionalidades BIM. Destaca-se a necessidade de desenvolver estudos sobre métodos de PCP que considerem a natureza parcialmente repetitiva das atividades de construção e aspectos relacionados à gestão dos fluxos de trabalho e do produto. O presente trabalho propõe um método para PCP baseado em zonas de trabalho com o apoio de BIM, e explora a sua interface com o LPS. A abordagem metodológica utilizada foi a Design Science Research, sendo conduzidos dois estudos empíricos em empresas atuantes no mercado imobiliário. As principais contribuições do método proposto estão ligadas às ferramentas utilizadas, que podem potencialmente contribuir para aumentar a qualidade da informação, principalmente relacionadas a fluxos de trabalho, e dar suporte para a tomada de decisão colaborativa.