Short-term load forecasting using a Gaussian process model: The influence of a derivative term in the input regressor
2012 ◽
Vol 6
(4)
◽
pp. 273-281
◽
Keyword(s):
2020 ◽
Vol 4
(1)
◽
pp. 1-25
◽
2003 ◽
Vol 18
(2)
◽
pp. 673-679
◽
Keyword(s):
2020 ◽
Vol 15
(9)
◽
pp. 1312-1320
Keyword(s):
2012 ◽
Vol 132
(12)
◽
pp. 1966-1972
◽
Keyword(s):
Keyword(s):