scholarly journals AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION

2012 ◽  
Vol 18 (4) ◽  
pp. 580-589 ◽  
Author(s):  
Yanshuai Zhang ◽  
S. Thomas Ng

Time and cost are the two most important factors to be considered in every construction project. In order to maximize the profit, both the client and contractor would strive to minimize the project duration and cost concurrently. In the past, most of the research studies related to construction time and cost assumed time to be constant, leaving the analyses based purely on a single objective of cost. Acknowledging this limitation, an evolutionary-based optimization algorithm known as an ant colony system is applied in this study to solve the multi-objective time-cost optimization problems. In this paper, a model is developed using Visual Basic for Application™ which is integrated with Microsoft Project™. Through a test study, the performance of the proposed model is compared against other analytical methods previously used for time-cost modeling. The results show that the model based on the ant colony system techniques can generate better solutions without utilizing excessive computational resources. The model, therefore, provides an efficient means to support planners and managers in making better time-cost decisions efficiently.

2010 ◽  
Vol 13 (1) ◽  
pp. 17-30
Author(s):  
Luan Hong Pham ◽  
Nhan Thanh Duong

Time-cost optimization problem is one of the most important aspects of construction project management. In order to maximize the return, construction planners would strive to optimize the project duration and cost concurrently. Over the years, many researches have been conducted to model the time-cost relationships; the modeling techniques range from the heuristic method and mathematical approach to genetic algorithm. In this paper, an evolutionary-based optimization algorithm known as ant colony optimization (ACO) is applied to solve the multi-objective time-cost problem. By incorporating with the modified adaptive weight approach (MAWA), the proposed model will find out the most feasible solutions. The concept of the ACO-TCO model is developed by a computer program in the Visual Basic platforms. An example was analyzed to illustrate the capabilities of the proposed model and to compare against GA-based TCO model. The results indicate that ant colony system approach is able to generate better solutions without making the most of computational resources which can provide a useful means to support construction planners and managers in efficiently making better time-cost decisions.


1999 ◽  
Vol 26 (6) ◽  
pp. 685-697 ◽  
Author(s):  
Tarek Hegazy

In the management of a construction project, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost trade-off (TCT) problem, which has been studied extensively in the project management literature. TCT decisions, however, are complex and require planners to select appropriate resources for each project task, including crew size, equipment, methods, and technology. As combinatorial optimization problems, finding optimal decisions is difficult and time consuming considering the number of possible permutations involved. In this paper, a practical model for TCT optimization is developed using the principle of genetic algorithms (GAs). With its robust optimization search, the GAs model minimizes the total project cost as an objective function and accounts for project-specific constraints on time and cost. To maximize its benefits, the model has been implemented as a VBA macro program. This automates TCT analysis and combines it with standard resource-management procedures. Details of the proposed TCT model are described and several experiments conducted to demonstrate its benefits. The developments made in this paper provide guidelines for designing and implementing practical GA applications in the civil engineering domain.Key words: computer application, time-cost trade-off, construction management, genetic algorithms, and optimization.


2016 ◽  
Vol 2016 ◽  
pp. 1-8 ◽  
Author(s):  
Qingyou Yan ◽  
Qian Zhang ◽  
Xin Zou

The study of traditional resource leveling problem aims at minimizing the resource usage fluctuations and obtaining sustainable resource supplement, which is accomplished by adjusting noncritical activities within their start and finish time. However, there exist limitations in terms of the traditional resource leveling problem based on the fixed project duration. This paper assumes that the duration can be changed in a certain range and then analyzes the relationship between the scarce resource usage fluctuations and project cost. This paper proposes an optimization model for the multiresource leveling problem. We take into consideration five kinds of cost: the extra hire cost when the resource demand is greater than the resource available amount, the idle cost of resource when the resource available amount is greater than the resource demand, the indirect cost related to the duration, the liquidated damages when the project duration is extended, and the incentive fee when the project duration is reduced. The optimal objective of this model is to minimize the sum of the aforementioned five kinds of cost. Finally, a case study is examined to highlight the characteristic of the proposed model at the end of this paper.


Author(s):  
Julio Cesar Ponce Gallegos ◽  
Fatima Sayuri Quezada Aguilera ◽  
José Alberto Hernandez Aguilar ◽  
Christian José Correa Villalón

The contribution of this chapter is to present an approach to explain the Ant Colony System applied on the Waste Collection Problem, because waste management is moving up to the concern over health and environmental impacts. These algorithms are a framework for decision makers in order to analyze and simulate various spatial waste management problems. In the last decade, metaheuristics have become increasingly popular for effectively confronting difficult combinatorial optimization problems. In the present work, an individual metaheuristic Ant Colony System (ACS) algorithm is introduced, implemented and discussed for the identification of optimal routes in the case Solid Waste collection. This algorithm is applied to a waste collection and transport system, obtaining recollection routes with the less total distance with respect to the actual route utilized and to the solution obtained by a previously developed approach.


2013 ◽  
Vol 717 ◽  
pp. 455-459
Author(s):  
Seung Gwan Lee ◽  
Seung Won Lee

Ant Colony System (ACS) is a new meta heuristics algorithms to solve hard combinatorial optimization problems. In this paper, we propose hybrid ant colony algotirhm that is searching the second best edge first in the state transition rule and updating the pheromone on edges applying the visited number of edge in the globally best tour. And we evaluate the proposed algorithm according to the maximum time for each trial. The results of a simulation experiment demonstrate that the proposed algorithm is better than, or, at least as good as, that of ACS algorithm in the most sets.