Study on the Schedule Management Methods of Projects Based on Critical Chain Technology
2014 ◽
Vol 488-489
◽
pp. 1454-1457
Keyword(s):
In view of the deficiency of the traditional schedule management methods in dealing with practical problems, on the basis of Dr. Goldratt s critical chain project management theory, the thesis optimizes his theory so as to build the critical chain schedule management model according to the actual needs of the program.