Implementation of Advanced Planning and Scheduling System in Manufacturing Industries

2013 ◽  
Vol 718-720 ◽  
pp. 2485-2490 ◽  
Author(s):  
Hadgu Haftu Hagazi ◽  
Xiao Jun Guo

Advanced planning and scheduling system's (APS) implementation and operation process for elaborating a production schedule in a production environment similar to what is found in industries. The main characteristics and restrictions of a real production environment were thus considered, such as multi-level structure products, production routes with sequential, parallel and alternative operations, more than one resource per operation and alternative resources. In terms of results, this study provides an overview of the main steps involved in the implementation and operational process of an APS system in an industry, providing an important indicator for choosing and using this sort of system. The expectations of APS systems have been high, both from academia and industry in the subject area of manufacturing planning and control. Relative the massive interest there has not been much written about how APS systems are used in practice and what effects an APS approach really results in.

2013 ◽  
Vol 467 ◽  
pp. 277-281
Author(s):  
Shao Ning Han ◽  
Hong Wang ◽  
Hang Wu ◽  
Pi Song Sun ◽  
Yu Hui Xue ◽  
...  

According to Chinese traditional classification, large-sized jackets weight over 10,000 tons and stand in over 100-meter water. Large-sized jackets are different from the normal in construction tonnage, structural dimension and quality control requirements as well as construction difficulty. More complicated construction technology and programme, higher grade of materials, stricter control requirements on node weld and higher risks all need matched stricter, more meticulous and more comprehensive management in planning and scheduling. Combined with construction of LW3-1 deep-water jacket, this paper describes the planning, tracking progress, process control and optimization.


2014 ◽  
Vol 2014 ◽  
pp. 1-7 ◽  
Author(s):  
Yunfang Peng ◽  
Dandan Lu ◽  
Yarong Chen

This paper deals with the advanced planning and scheduling (APS) problem with multilevel structured products. A constraint programming model is constructed for the problem with the consideration of precedence constraints, capacity constraints, release time and due date. A new constraint programming (CP) method is proposed to minimize the total cost. This method is based on iterative solving via branch and bound. And, at each node, the constraint propagation technique is adapted for domain filtering and consistency check. Three branching strategies are compared to improve the search speed. The results of computational study show that the proposed CP method performs better than the traditional mixed integer programming (MIP) method. And the binary constraint heuristic branching strategy is more effective than the other two branching strategies.


Sign in / Sign up

Export Citation Format

Share Document