TBM Selection for tunneling beneath urbanized areas at shallow depth. A practical case: The machine selection for the excavation of Metro Gran Paris Line 15 Section 2C
Dynamic Swarm Based Virtual Machine Selection for Optimizing Execution Time and Fault Tolerance Rate
2019 ◽
Vol 7
(5)
◽
pp. 1136-1147
1994 ◽
Vol 25
(2)
◽
pp. 131-143
◽
2017 ◽
Vol 9
(2)
◽
pp. 169-183
◽
Keyword(s):
Keyword(s):