Analysis and Research on Reducing Roll Consumption in Medium and Heavy Plate Production Line

2021 ◽  
2000 ◽  
Vol 36 (5) ◽  
pp. 3686-3689 ◽  
Author(s):  
T. Nakagawa ◽  
M. Hama ◽  
T. Furukawa

2020 ◽  
Vol 53 (2) ◽  
pp. 12050-12055
Author(s):  
Tongkang Zhang ◽  
Yufei Ma ◽  
Depeng Xu ◽  
Changxin Liu ◽  
Jinliang Ding

2000 ◽  
Vol 27 (5) ◽  
pp. 381-386 ◽  
Author(s):  
H. Lachmund ◽  
V. Schwinn ◽  
H.A. Jungblut

2020 ◽  
Vol 4 (1) ◽  
pp. 1-12
Author(s):  
Stephen C. Nwanya ◽  
Celestine N. Achebe

Shortest product cycle time is a key criterion for job sequencing and measuring competitiveness among entrepreneurial-based firms. Now, the long waiting time of job orders constitutes a deterministic production line problem in vehicle number plate production plants in Nigeria. Case studies were conducted on those plants, confidentially identified in this paper as A, B, C, and D. Delays caused by non-value-adding work processes are major culprits among other contributors to the long queues at these plants. The value stream mapping technique was applied to identify non-value adding activities before the production line was balanced using an effective cycle time model. The index cases to a balanced line, as shown in the results, are increases in process rate by 41 %, 59 %, 42 %, and 71 % for  A, B, C, and D, respectively, and overall line efficiency. Next, the system capacities correspondingly increased with the elimination of wastages.  These increments imply that bottleneck activities have been minimized, and we have a balanced production line. The devised solution procedure is reliable and recommended to other line manufacturing concerns that experience delays and bottleneck problems.


2012 ◽  
Vol 214 ◽  
pp. 674-678
Author(s):  
Wen Wei Yu ◽  
Xue Tao Wang

The automation control system to plate production line is developed independently. It has been applied for several plants in China and has a good effect. The whole automaton control system is designed as several levels: basic automation system, process automation system and HMI system. The control functions are realized with these levels. With AGC function in plate mill area basic automation system, the plate thickness accuracy can be guaranteed.


Sign in / Sign up

Export Citation Format

Share Document