Prediction of Software Project Effort Estimation: A Case Study

Author(s):  
Mohd. Sadiq ◽  
Mohammad Asim ◽  
Javed Ahmed ◽  
Vinish Kumar ◽  
Shadab Khan
Author(s):  
Adam Trendowicz ◽  
Ross Jeffery

2018 ◽  
Vol 7 (3) ◽  
pp. 1812
Author(s):  
Archana Srivastava ◽  
Dr. K. Singh ◽  
Dr Syed Qamar Abbas

Use Case Point Method (UCP) is used to estimate software development effort. UCP uses a project’s use cases to produce a reasonable estimate of a project’s complexity and required man hours. Advance Use Case Point Method (AUCP) is an extension of UCP. AUCP extends UCP by adding the additional effort required in incorporating end user development (EUD) features in the software for overall project effort estimation. Today user needs are diverse, complex, and frequently changing hence need of EUD is also increasing. EUD features if incorporated in the software increases end user satisfaction exponentially but incorporating EUD features increases design time complexity and increases the effort significantly based on the end users requirements. This paper provides a case study to demonstrate the comparative analysis of UCP and AUCP using paired t-test. It also observes that there can be on an average 20% increase in overall effort of development on adding EUD features.  


Author(s):  
Bernhard Peischl ◽  
Markus Zanker ◽  
Mihai Nica ◽  
Wolfgang Schmid

Author(s):  
Prabhakar Rao ◽  
Seetha Ramaiah

This paper theme is to provide a case study of Software Project Development cost, effort, and schedule estimation. From recent past, a remarkable research takes place in developing different techniques on software effort and cost estimation. Making estimation before start of any project is necessary to be able to plan and manage any project. The estimate is an intelligent guess for the project resources. Nowadays, software has become a major contributor to economic growth for any nation. Making an estimate before starting any software project is vital for the project managers and key stakeholders. Major project milestones such as project schedules, budgeting, resource allocation, and project delivery dates are set on theeffort and cost estimates. Thus, the reliability of the estimation leads any project success or otherwise fail. In this article, author’s idea is to work with function point analysis and include the concept of workforce scheduling in a better way while taking the decision in the contract phase. That leads to strengthening the relations between the developer and the customer. Basically, size is a main measured unit of the software project. Based on the size and other functionalities, the software managers estimate the total effort required to develop the project. From the effort and work schedule, the total cost can be estimated. 