Erratum to : A Heuristic Approach to Optimal Gas Supply Problem for Joint Electric Power Plant
1990 ◽
Vol 26
(9)
◽
pp. 1104a-1104a
Keyword(s):
1990 ◽
Vol 26
(8)
◽
pp. 886-893
Keyword(s):
1989 ◽
Vol 109
(4)
◽
pp. 254-261
2014 ◽
Vol 492
◽
pp. 586-589
◽
Keyword(s):
1906 ◽
Vol 62
(1608supp)
◽
pp. 25758-25758
2021 ◽
Vol 1887
(1)
◽
pp. 012015
Keyword(s):
2020 ◽
Vol 1679
◽
pp. 052027
Keyword(s):
Keyword(s):
Corrigendum: The steam and electric power plant of Imperial Chemical Industries, Ltd., at Billingham
1931 ◽
Vol 69
(419)
◽
pp. 1389-1389
2001 ◽
Vol 138
(1-3)
◽
pp. 277-288
◽