deformation rate analysis
Recently Published Documents


TOTAL DOCUMENTS

11
(FIVE YEARS 1)

H-INDEX

4
(FIVE YEARS 0)

2012 ◽  
Vol 170-173 ◽  
pp. 1427-1431
Author(s):  
Jian Ning Cui ◽  
Yong Tao Gao ◽  
Jin Qiang Wang ◽  
Jian Li ◽  
Fu Gen Deng

The construction time of secondary lining in loess tunnel has been the focus of attention in the tunnel field, but no specific quantitative discriminant index of the construction time of the secondary lining has been applied. Relying on the Wofosi tunnel of Zhangjiakou-Zhuolu highway, based on the deformation characteristics and deformation rate analysis of the crown settlement and surrounding convergence, proposed that the stability of basic rate as the indicators of construction time of secondary lining, determined preliminarily the construction time of secondary lining by optimizing the regression model, combined with the characteristics of the rock pressure and pressure distribution state along the hole to determine the best construction time of secondary lining


2008 ◽  
Vol 134 (4) ◽  
pp. 132-137 ◽  
Author(s):  
Jianqing Cai ◽  
Jiexian Wang ◽  
Jicang Wu ◽  
Congwei Hu ◽  
Erik Grafarend ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document