bridge wim
Recently Published Documents


TOTAL DOCUMENTS

6
(FIVE YEARS 1)

H-INDEX

2
(FIVE YEARS 1)

2020 ◽  
Vol 10 (14) ◽  
pp. 4708 ◽  
Author(s):  
Donya Hajializadeh ◽  
Aleš Žnidarič ◽  
Jan Kalin ◽  
Eugene John OBrien

This study describes the development and testing of a railway bridge weigh-in-motion (RB-WIM) system. The traditional bridge WIM (B-WIM) system developed for road bridges was extended here to calculate the weights of railway carriages. The system was tested using the measured response from a test bridge in Poland, and the accuracy of the system was assessed using statically-weighed trains. To accommodate variable velocity of the trains, the standard B-WIM algorithm, which assumes a constant velocity during the passage of a vehicle, was adjusted and the algorithm revised accordingly. The results showed that the vast majority of the calculated carriage weights fell within ±5% of their true, statically-weighed values. The sensitivity of the method to the calibration methods was then assessed using regression models, trained by different combinations of calibration trains.


2012 ◽  
Vol 44 ◽  
pp. 13-22 ◽  
Author(s):  
Jason Dowling ◽  
Eugene J. OBrien ◽  
Arturo González

Sign in / Sign up

Export Citation Format

Share Document