Schedule Updating and Project Control

Keyword(s):  
2014 ◽  
Author(s):  
Werner Rutten ◽  
Harry Martin ◽  
Guy Janssens
Keyword(s):  

2005 ◽  
Vol 12 (4) ◽  
pp. 351-372 ◽  
Author(s):  
Khaled Al‐Reshaid ◽  
Nabil Kartam ◽  
Narendra Tewari ◽  
Haya Al‐Bader

PurposeIt is a well‐known fact that the construction industry always passes through two distinctive problems during the construction stage: slippages of project‐schedules, i.e. time‐frame, and overruns of project‐costs, i.e. budget. However, limited literature is available to solve or dilute these two problems before they even occur. It is strongly believed that the bulk of the two mentioned problems can be mitigated to a great extent, if not eliminated, provided that proper attention is paid to the pre‐construction phases of projects. Normally projects are implemented through traditionally old techniques which generally emphasize only solving “construction problems during the construction phase”. The aim of this article is therefore to unveil a professional methodology known as Project Control System (PCS) focusing on pre‐construction phases of construction projects.Design/methodology/approachIn this article, the authors share the lessons learned during implementation of Kuwait University projects worth approximately $400 million in a span of ten years. The task of the project management/construction management (PM/CM) is being provided to the university by a joint venture team of international and local specialists.FindingsThe pre‐construction methodology ensures smooth and successful implementation during construction phases of the projects as they are generally executed in a fast‐pace, deadline‐driven and cost‐conscious environment. The intuitive proactive methods, if implemented during pre‐construction stage, automatically answer the questions that are encountered during the execution periods of projects.Originality/valueIn this article, the authors share the lessons learned during PM/CM during projects over a span of ten years, which could be of use to others.


2019 ◽  
Vol 4 (1) ◽  
pp. 1-25
Author(s):  
Patrick Odongo ◽  
Dr Kepha Ombui

Purpose: The current study sought to establish determinants of successful implementation of non-government organization health projects in Kibera informal settlement. The study sought to establish how community participation, resource mobilization, communication and project control determines successful implementation of health projects for NGOs operating in Kibera informal settlement.Methodology: The study adopted a descriptive survey design and 116 questionnaires were issued but only 92 questionnaires were received which represented a 79% response rate.Results: The results of the study revealed that resource mobilization, communication and project control positively and significantly determined successful implementation of health projects by Non-Governmental organizations in Kibera as shown by r=0.443, r=0.511 and r=0.798 respectively while community participation negatively determined the implementation success of the projects (r= -0.078).Recommendations: The study recommends that NGOs implementing health projects in Kibera should focus on mobilizing resources since the practice contributes to successful implementation of the projects. NGOs can achieve this by actively engaging sponsors, conducting harambees, networking and presenting grant proposals to prospective financiers to solicit resources for implementing the health projects. Additionally, the study recommends that NGOs implementing health projects in Kibera should focus on project communication since the practice contributes to successful implementation of the projects. NGOs can achieve this by establishing a concise project communication plan, and through continuous communication with project teams and stakeholders on matters concerning the progress of the project. The study further recommends that NGOs implementing health projects in Kibera should focus on project control since the practice contributes to successful implementation of the projects.NGOs can achieve this by using project management information systems in designing and controlling health projects, conducting a variance analysis on the progress of the project and by providing updates on the status of the project to the relevant stakeholders. 


2019 ◽  
pp. 227-295
Author(s):  
Adedeji B. Badiru

2018 ◽  
pp. 113-127
Author(s):  
H. Selcuk Agca ◽  
Giancarlo Cotone
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document