Audio/visual information in construction project control

1997 ◽  
Vol 28 (2) ◽  
pp. 97-101 ◽  
Author(s):  
Osama Abudayyeh
2006 ◽  
Vol 6 (13) ◽  
pp. 2724-2732 ◽  
Author(s):  
Guo-Cheng Li . ◽  
Lie-Yun Ding . ◽  
Jing-Tao Wang .

2020 ◽  
Vol 10 (3) ◽  
pp. 1085 ◽  
Author(s):  
Morteza Hamooni ◽  
Mojtaba Maghrebi ◽  
Javad Majrouhi Sardroud ◽  
Sungjin Kim

The concrete formwork process is a critical component of construction project control because failing to gain the necessary concrete strength can lead to reworks and, consequently, project delays and cost overruns during the project’s execution. The goal of this study is to develop a novel method of monitoring the maturity of concrete and providing reduced formwork removal time with the strength ensured in real-time. This method addresses the wireless sensors and building information modeling (BIM) needed to help project management personnel monitor the concrete’s status and efficiently decide on the appropriate formwork removal timing. Previous studies have focused only on the monitoring of concrete’s status using sensor data or planning the formwork layout by integrating the BIM environment into the design process. This study contributes to extending BIM’s interoperability for monitoring concrete’s maturity in real-time during construction, as well as determining the formwork removal time for project control. A case study was conducted at a building construction project to validate the developed framework. It was concluded that BIM can interoperate with the data collected from sensors embedded in concrete, and that this system can reduce formwork removal time while retaining sufficient strength in the concrete, rather than adhering to the removal time given in building code standards.


2014 ◽  
Vol 20 (1) ◽  
pp. 47-58 ◽  
Author(s):  
Hui-Ping Tserng ◽  
Shih-Ping Ho ◽  
Shu-Hui Jan

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.


Sign in / Sign up

Export Citation Format

Share Document