Analysis of Commonly used Scheduling Models for Multistage Biopharmaceutical Processes

Author(s):  
Vaibhav Kumar ◽  
Munawar A. Shaik ◽  
Arpit Jain
Keyword(s):  
2021 ◽  
Vol 13 (6) ◽  
pp. 3400
Author(s):  
Jia Ning ◽  
Sipeng Hao ◽  
Aidong Zeng ◽  
Bin Chen ◽  
Yi Tang

The high penetration of renewable energy brings great challenges to power system operation and scheduling. In this paper, a multi-timescale coordinated method for source-grid-load is proposed. First, the multi-timescale characteristics of wind forecasting power and demand response (DR) resources are described, and the coordinated framework of source-grid-load is presented under multi-timescale. Next, economic scheduling models of source-grid-load based on multi-timescale DR under network constraints are established in the process of day-ahead scheduling, intraday scheduling, and real-time scheduling. The loads are classified into three types in terms of different timescale. The security constraints of grid side and time-varying DR potential are considered. Three-stage stochastic programming is employed to schedule resources of source side and load side in day-ahead, intraday, and real-time markets. The simulations are performed in a modified Institute of Electrical and Electronics Engineers (IEEE) 24-node system, which shows a notable reduction in total cost of source-grid-load scheduling and an increase in wind accommodation, and their results are proposed and discussed against under merely two timescales, which demonstrates the superiority of the proposed multi-timescale models in terms of cost and demand response quantity reduction.


2012 ◽  
Vol 220-223 ◽  
pp. 78-82
Author(s):  
Zhi Bing Lu ◽  
Ai Min Wang ◽  
Cheng Tong Tang ◽  
Jing Sheng Li

The current environment is experiencing a transformation from multi varieties and little batch to multi varieties and batch, this situation has result that companies’ management do not suite it. According to this the scheduling frame research facing rapid response manufacturing has been proposed. At first through this analyzing the problem in current situation, the whole scheduling frame is researched. Secondly, many models that can be used in this frame have been discussed such as manufacturing information, disturbance events, automatic scheduling and dynamic scheduling models. Finally the whole scheduling platforms which can be used in practical situation has been proposed and make a technical function base for current manufacturers.


Author(s):  
Akindipe Olusegun Francis ◽  
Bugingo Emmanuel ◽  
Defu Zhang ◽  
Wei Zheng ◽  
Yingsheng Qin ◽  
...  

Author(s):  
Jose M. Framinan ◽  
Rainer Leisten ◽  
Rubén Ruiz García
Keyword(s):  

2015 ◽  
pp. 155-224
Author(s):  
Emmanouil Bakirtzis ◽  
Evaggelos Kardakos ◽  
Stylianos Vagropoulos ◽  
Christos Simoglou ◽  
Anastasios Bakirtzis
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document