Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work
2016 ◽
Vol 63
(2)
◽
pp. 172-183
◽
Keyword(s):
2013 ◽
Vol 690-693
◽
pp. 3007-3013
2017 ◽
Vol 34
(04)
◽
pp. 1750011
◽
2016 ◽
Vol 40
(21-22)
◽
pp. 8862-8871
◽
2019 ◽
Vol 107
◽
pp. 19-31
◽
2015 ◽
Vol 79
◽
pp. 168-174
◽
Keyword(s):
2011 ◽
Vol 26
(3)
◽
pp. 437-447
◽
Keyword(s):
2013 ◽
Vol 46
(1-2)
◽
pp. 51-66
◽