Research on Prediction Algorithm for Heavy Overload of Main Equipment in Distribution Network

Author(s):  
Dawei Li ◽  
Jingwen Shen ◽  
Jian Chen ◽  
Yuxiang Xie ◽  
Zhenfeng Xiao
2019 ◽  
Vol 5 (1) ◽  
pp. 35-45
Author(s):  
Markus Dwiyanto Tobi ◽  
Alimuddin Mappa

The role of the power supply device is to produce, process and distribute energy sources. Telecommunication equipment can only operate if it has continuous supply. Therefore, to maintain the continuity of the supply, a UPS (Uninterruptable Power Supply) device system is needed so that the supply to the Essential Load device will remain available so that continuity will be maintained. This research designs and proposes how a series of automatic redundant switch systems on UPS to ensure the availability of power supply for the main equipment of telecommunications systems. The Auto switch circuit is designed to have 3 (three) working stages which will trigger the relay driver as control circuit, namely the normal working condition of the contactor input K1 is present, the input condition is zero (lost), and the input condition is present. This system can automatically supply power to telecommunications equipment.


2009 ◽  
Vol 129 (6) ◽  
pp. 733-744 ◽  
Author(s):  
Shoji Kawasaki ◽  
Yasuhiro Hayashi ◽  
Junya Matsuki ◽  
Hirotaka Kikuya ◽  
Masahide Hojo

2012 ◽  
Vol 132 (10) ◽  
pp. 853-861 ◽  
Author(s):  
Takuya Ishitani ◽  
Ryoichi Hara ◽  
Hiroyuki Kita ◽  
Eiji Kogure ◽  
Yuki Mitsukuri ◽  
...  

2018 ◽  
Vol 138 (6) ◽  
pp. 494-500
Author(s):  
Hiromitsu Ikegami ◽  
Hiroyuki Mori
Keyword(s):  

Author(s):  
R. Z. Aminov ◽  
A. N. Bayramov ◽  
M. V. Garievskii

The paper gives the analysis of the problem of the primary current frequency regulation in the power system, as well as the basic requirements for NPP power units under the conditions of involvement in the primary regulation. According to these requirements, the operation of NPPs is associated with unloading and a corresponding decrease in efficiency. In this regard, the combination of nuclear power plants with a hydrogen complex is shown to eliminate the inefficient discharge mode which allows the steam turbine equipment and equipment of the reactor facility to operate in the basic mode at the nominal power level. In addition, conditions are created for the generation and accumulation of hydrogen and oxygen during the day, as well as additionally during the nighttime failure of the electrical load which allows them to be used to generate peak power.  The purpose of the article is to assess the systemic economic effect as a result of the participation of nuclear power plants in combination with the hydrogen complex in the primary control of the current frequency in the power sys-tem, taking into account the resource costs of the main equipment. In this regard, the paper gives the justification of cyclic loading of the main equipment of the hydrogen complex: metal storage tanks of hydrogen and oxygen, compressor units, hydrogen-oxygen combustion chamber of vapor-hydrogen overheating of the working fluid in the steam turbine cycle of a nuclear power plant. The methodological foundations for evaluating the working life of equipment under cyclic loading with the participation in the primary frequency control by the criterion of the growth rate of a fatigue crack are described. For the equipment of the hydrogen complex, the highest intensity of loading is shown to occur in the hydrogen-oxygen combustion chamber due to high thermal stresses.  The system economic effect is estimated and the effect of wear of the main equipment under cyclic loading is shown. Under the conditions of combining NPP power units with a hydrogen complex, the efficiency of primary reg-ulation is shown to depend significantly on: the cost of equipment subjected to cyclic loading; frequency and intensity of cyclic loading; the ratio of the tariff for peak electricity, and the cost of electricity of nuclear power plants.  Based on the developed methodology for assessing the effectiveness of the participation of nuclear power plants with a hydrogen complex in the primary frequency control, taking into account the damage to the equipment, the use of the hydrogen complex is shown to provide a tangible economic effect compared with the option of unloading nuclear power plants with direct participation in frequency control.


Sign in / Sign up

Export Citation Format

Share Document