A Multi-Objective Approach for both Makespan- and Energy-Efficient Scheduling in Injection Molding

Author(s):  
Klaas Dählmann ◽  
Jürgen Sauer
Energies ◽  
2021 ◽  
Vol 14 (21) ◽  
pp. 7446
Author(s):  
Adrian Kampa ◽  
Iwona Paprocka

The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with exponentially distributed interarrival times and are carried out according to the times assumed as predefined. Tasks arriving from one waiting queue are handled in the order set by the Multi Objective Immune Algorithm. Tasks are stored in a finite-capacity buffer if machines are busy, or setup activities are being performed. Whenever a production system is idle, machines are stopped according to shutdown times in order to save energy. A machine requires setup time before executing the first batch of jobs after the idle time. Scientists agree that turning off an idle machine is a common measure that is appropriate for all types of workshops, but usually requires more steps, such as setup and shutdown. Literature analysis shows that there is a research gap regarding multi-objective algorithms, as minimizing energy consumption is not the only factor affecting the total manufacturing cost—there are other factors, such as late delivery cost or early delivery cost with additional storage cost, which make the optimization of the total cost of the production process more complicated. Another goal is to develop previous scheduling algorithms and research framework for energy efficient scheduling. The impact of the input data on the production system performance and energy consumption for series production is investigated in serial, parallel or serial–parallel flows. Parallel flow of upcoming tasks achieves minimum values of makespan criterion. Serial and serial–parallel flows of arriving tasks ensure minimum cost of energy consumption. Parallel flow of arriving tasks ensures minimum values of the costs of tardiness or premature execution. Parallel flow or serial–parallel flow of incoming tasks allows one to implement schedules with tasks that are not delayed.


2010 ◽  
Vol 143-144 ◽  
pp. 663-667
Author(s):  
Tian Qi Yang

Based on the basic model of economic dispatch and energy-efficient power generation scheduling rules, the multi-objective optimization model of energy-efficient scheduling is given. The model is transformed into unconstrained optimization problem by means of penalty factor and the dynamic penalty function, and then solved by PSO algorithm. The results obtained demonstrate the rationality and effectiveness of the proposed model.


Sign in / Sign up

Export Citation Format

Share Document