IT-Merger-Integration und IT-Carve-Out — Externes Wachstum und Desinvestitionen durch IT unterstützen

2005 ◽  
pp. 64-84
Author(s):  
Dirk Buchta ◽  
Marcus Eul ◽  
Helmut Schulte-Croonenberg
Keyword(s):  
2004 ◽  
Vol 99 (5) ◽  
pp. 239-242
Author(s):  
Eberhard Abele ◽  
Jens Elzenheimer ◽  
Markus Bundschuh

Author(s):  
Johannes Gerds ◽  
Gerhard Schewe

2017 ◽  
Vol 8 (2) ◽  
pp. 228
Author(s):  
Dusica Stevcevska Srbinoska ◽  
Edi Smokvarski

Selecting the best integration approach is a meticulous and sensitive process that can mold the completion of the merger and/or acquisition transaction. In this paper, I discuss that implementing the proper integration approach leads to mitigating or increasing impending risks when going into major company restructuring events. If proper selection and execution takes place, and all related processes and expectations of the parties involved are duly taken into account, successful post-merger integration can be concluded in the Republic of Macedonia in spite of numerous difficulties. One of the greatest risk factors certainly lies in the satisfaction or dissatisfaction of the work force which is of vital meaning for the operational excellence of every entity. Three different integration approaches - absorption, symbiosis, and preservation - are observed through literature overview and particular transactions. Additionally, I study the example of the integration approach adopted by one. Vip doo Skopje following the merger of Vip operator dooel Skopje and ONE in 2015, accentuating that multiple factors can increase or deteriorate the chances of integration success.


Author(s):  
Elena Gorda

The generalization of the concept of the task in terms of information environments of construction [ISB] is performed. The approach to the presentation of such concepts as construction issues, construction problem, ontology, idea, concept, classification of problems, tasks, directions, objects included in the staging part of the tasks taking into account the specifics of the tasks solved within the developed information technologies in construction issues. The paper defines and investigates on the basis of methods of construction geodesy the actual tasks of construction, design, modeling, monitoring and their totality in the field of construction by means of information theory. An approach to the description of the technical condition of a construction object on the basis of information modeling in the management of the construction process and information modeling within the life cycle is proposed and described. Information modeling is a process, the results of each stage of which, ie information models of the building, differ greatly from each other depending on the stage of the life cycle of the object and the requirements for modeling in solving emerging problems. The construction object strongly depends on the stage of its existence: if during the design it is virtual, and during construction it gradually finds a real embodiment, then at a long stage of operation the building enters a period of stability and is no longer subject to significant changes. An information model is a variable object that depends on the range of tasks to be solved. Using the methods of construction geodesy in the field of construction, the field of problems, class of problems, the concept of the problem, the state of the problem, subtasks, chains of problems, problem solving and the result of solving the problem, the relationship between problems setting the transformation of aggregation, merger, integration. The urgency of the task from a theoretical point of view is determined by the expansion of the ontology of construction as a science, from an applied point of view is determined by the possibility of accurate formalization of regulatory information and documentation in construction.


Change Power ◽  
2001 ◽  
pp. 92-99
Author(s):  
Dietrich Buchner ◽  
Ulrich Hofmann ◽  
Stephan Magnus

Sign in / Sign up

Export Citation Format

Share Document