Environmental impact assessment in ghana-anex post evaluation of the volta resettlement scheme: the case of the Kpong Hydro-electric project

1990 ◽  
Vol 10 (2) ◽  
pp. 115-126 ◽  
Author(s):  
Sam Ofori-Cudjoe
2013 ◽  
Vol 437 ◽  
pp. 1038-1045
Author(s):  
Bin Bin Tang ◽  
Bao Chen Liu ◽  
Zhi Hua Deng

The environmental post evaluation index system is proposed to evaluate the cascade hydropower project`s post environmental impact assessment. We also constructed an evaluation method based on Matter-element and Analytic-hierarchy coupling model (FME-AHP) to apply to the environmental impact assessment of Yuan Shui cascade hydropower stations. It can test the index system and evaluation method is scientific and validity or not. We hope we can provide some experience and reference for the environmental impact assessment of the hydropower exploitation in key river basin both in China and abroad.


Sign in / Sign up

Export Citation Format

Share Document